Trademark: 79201032
Word
WALDNER LABS
Status
Registered
Status Code
700
Status Date
Tuesday, February 27, 2018
Serial Number
79201032
Registration Number
5409466
Registration Date
Tuesday, February 27, 2018
Mark Type
4000
Filing Date
Tuesday, June 28, 2016
Published for Opposition
Tuesday, December 12, 2017

Trademark Owner History
WALDNER Holding SE & Co. KG - Original Registrant
WALDNER Holding GmbH & Co. KG - Owner At Publication

Classifications
9 Media, ceiling, and floor supply apparatus, namely, electrical ducts; blank magnetic data carriers, blank recordable optical discs; data processors and computers; laboratory furniture; electrical power installations, namely, electrical power distribution blocks; telecommunications and information technology installations for building automation, namely, computer hardware for building control, regulating and monitoring; furniture especially for laboratories, namely, experiment benches, laboratory tables, trolley tables, laboratory cabinets, safety cabinets, chemical storage cabinets, cabinets for acids and alkaline solutions, solvent cabinets, supply and disposal cabinets, transport and storage containers of plastic, with or without a steel casing, experiment tables, laboratory tables, safety work benches, clean work benches, clean room cubicles, photography laboratory tables, cabinets, seats
19 Non-metal ceiling structures with coverings, claddings and utility systems, namely, non-metallic ceiling tiles, non-metallic ceiling boards, non-metallic ceiling plates, non-metallic ceiling sheets, non-metallic ceiling medallions, non-metallic ceiling panels; non-metallic transportable and non-transportable buildings; refractory construction materials, not of metal; non-metal partitions for building; doors, not of metal; framework for building, not of metal; interior wall panels, not of metal
37 Maintenance, installation, repair and servicing of laboratory equipment, air conditioning systems and fire alarm systems
11 Apparatus for heating, steam generating, cooking, refrigerating, drying, ventilating, air conditioning and water supply, namely, air exchangers for cleaning and purifying air, air conditioners, air handlers, air sterilizers, and air filtering installations; ventilating apparatus and installations for industrial use for laboratories, namely, ventilating fans for industrial use for laboratories; chemical processing drying installations for fluidization, namely, drying cabinets, filter dryers, vacuum drying chambers, hurdle drying chambers, heated cabinets, and incubation drying cabinets for the pharmaceutical industry; mixer taps for water pipes, water spray guns in the nature of irrigation spray nozzles, water treatment apparatus in the nature of water filtration units, sewage purification installations, and plumbing fittings in the nature of grease traps, all being parts of sanitary installations; sanitary installations, apparatus and equipment, namely, wash-hand basins; fume extractor ventilation hoods for laboratories; waste water treatment tanks; water purification installations, gas purification machines; heating installations; rinsing modules, namely, sinks; ventilation hoods in the nature of mobile fume hoods, fixed built-in fume hoods and fume hoods with built-in washers and filters; ventilation hoods for soldering fumes; extractor hoods for kitchens; drying chambers, namely, drying apparatus for chemical processing; water conditioning installations; exhaust air and feed air installations, namely, air purifying units for laboratory use; direct and indirect lighting installations; push-through fume ventilation hoods; lighting apparatus; ventilation hoods
42 Scientific research; industrial design; industrial research in the field of laboratory infrastructure development and laboratory equipment; design and development of computer hardware and software; construction drafting; engineering services, particularly technical project planning and design engineering of installations for the food industry, of laboratories, and of water and waste water treatment installations; design and development of technical building equipment in the areas of electrical engineering and building automation, air-conditioning technology, clean room technology, sanitary technology, warmth and heating technology, refrigeration technology and cooling supply and disposal technology; planning of buildings and infrastructure systems for buildings, namely, planning of workplace processes in terms of work, logistics and automation in laboratories, offices, educational establishments, storage facilities, hospitals and doctors' surgeries; engineering consultancy; architecture consultancy
"LABS"

Trademark Events
Feb 27, 2023
Courtesy Reminder - Sec. 71 (6-Yr) E-Mailed
Nov 18, 2022
New Representative At Ib Received
Jul 2, 2022
Change Of Name/Address Rec'd From Ib
May 21, 2020
New Representative At Ib Received
Dec 27, 2018
New Representative At Ib Received
Jun 29, 2018
Final Decision Transaction Processed By Ib
Jun 21, 2018
New Representative At Ib Received
Jun 6, 2018
Final Disposition Notice Sent To Ib
Jun 6, 2018
Final Disposition Processed
May 27, 2018
Final Disposition Notice Created, To Be Sent To Ib
Feb 27, 2018
Registered-Principal Register
Dec 12, 2017
Official Gazette Publication Confirmation E-Mailed
Dec 12, 2017
Published For Opposition
Dec 8, 2017
Notification Processed By Ib
Nov 22, 2017
Notification Of Possible Opposition Sent To Ib
Nov 22, 2017
Notice Of Start Of Opposition Period Created, To Be Sent To Ib
Nov 22, 2017
Notification Of Notice Of Publication E-Mailed
Nov 3, 2017
Approved For Pub - Principal Register
Nov 2, 2017
Teas/Email Correspondence Entered
Nov 2, 2017
Correspondence Received In Law Office
Nov 2, 2017
Teas Response To Office Action Received
Jun 30, 2017
New Representative At Ib Received
May 3, 2017
Notification Of Non-Final Action E-Mailed
May 3, 2017
Non-Final Action E-Mailed
May 3, 2017
Non-Final Action Written
May 2, 2017
Teas/Email Correspondence Entered
May 2, 2017
Correspondence Received In Law Office
May 2, 2017
Teas Response To Office Action Received
May 2, 2017
Attorney/Dom.Rep.Revoked And/Or Appointed
May 2, 2017
Teas Revoke/App/Change Addr Of Atty/Dom Rep Received
Mar 4, 2017
Refusal Processed By Ib
Feb 14, 2017
Non-Final Action Mailed - Refusal Sent To Ib
Feb 14, 2017
Refusal Processed By Mpu
Feb 14, 2017
Application Filing Receipt Mailed
Feb 12, 2017
Non-Final Action (Ib Refusal) Prepared For Review
Feb 11, 2017
Non-Final Action Written
Feb 8, 2017
Assigned To Examiner
Feb 8, 2017
New Application Office Supplied Data Entered
Feb 2, 2017
Sn Assigned For Sect 66a Appl From Ib

Trademark Alertz updated from USPTO on 2030-01-24