The mark consists of a wordings ProCPM SCHEDULING. The word Pro is in black color and CPM is in red color and the word SCHEDULING is in black color. The mark shows a abstract design on the left side of the mark in red and black color. The mark shows a clock instead of alphabet o in the word ProCPM.
PRO CONSTRUCTION PROJECT MANAGEMENT SCHEDULING
The color(s) enter black, and red is/are claimed as a feature of the mark.