Trademark: 97334016
Word
HYGRID
Status
Pending
Status Code
731
Status Date
Wednesday, April 10, 2024
Serial Number
97334016
Mark Type
4000
Filing Date
Monday, March 28, 2022
Published for Opposition
Tuesday, May 30, 2023

Trademark Owner History
ADERIS ENERGY, LLC - Owner At Publication
Solar Operations Solutions, LLC - Original Applicant

Classifications
9 Apparatus and instruments for monitoring and controlling energy generation, transformation, distribution, and storage, namely, data aggregators, computers, inverters, storage devices, transformers, meters, reclosers, real time automation controllers, weather stations, electrical vehicle charging stations, and wind energy generation equipment; Apparatus and instruments for monitoring and controlling energy generation, transformation, distribution, and storage at facilities and aggregates of those facilities, namely, data aggregators, computers, inverters, storage devices, transformers, meters, reclosers, real time automation controllers, weather stations, electrical vehicle charging stations, and wind energy generation equipment; Electric control devices for solar power generation systems that monitor generation of system and control output of solar inverters; Electric control devices for integration and control of electric power generation sources that monitor the output of the system, monitor the integration with the grid, and allow control of the output and characteristics of the energy generated; Electric control devices for microgrids that monitor all resources on the microgrid and control and dispatch the microgrid to create a specific output profile; Electric control devices for aggregating power generated from microgrids; Electric controllers comprising computers, meters, reclosers, and real time automation controller hardware and downloadable software for use in the field of renewable energy generation and storage for monitoring and controlling the function and status of microgrids; Equipment for operating a microgrid, namely, computers, meters, reclosers, and real time automation controller and downloadable software for monitoring and controlling operation of microgrids; Electric control devices for integration and control of energy storage sources; Electric control devices for integration with energy markets.
42 Design and development of energy microgrids and utility-scale renewable energy power plants; consulting services in the field of design of renewable energy microgrids, utility-scale renewable energy power plants, or aggregates of microgrids and power plants; design and development of sustainable energy microgrids, utility-scale sustainable energy power plants, or aggregates of microgrids and power plants; Technological planning and consulting services in the field of renewable energy microgrids; Technological planning and consulting services in the field of utility-scale renewable energy power plants; Technological planning and consulting services in the field aggregates of microgrids and power plants; Design and engineering of electric power control and automation systems; Design and engineering of electric power system transmission and distribution units; Design and engineering of power distribution or transmission system control, protection, automation and monitoring systems; Engineering services in the field of renewable electric power systems; Design and engineering of electric power microgrid control and automation systems; Design and engineering of systems to control and automate integration of electric power generation sources; Providing an interactive website enabling users to access information in the field of electrical generation assets and generate reports regarding the operation of microgrids.

Trademark Events
Apr 11, 2024
Notice Of Approval Of Extension Request E-Mailed
Apr 10, 2024
Sou Extension 2 Granted
Apr 10, 2024
Sou Extension 2 Filed
Apr 10, 2024
Sou Teas Extension Received
Nov 7, 2023
Notice Of Approval Of Extension Request E-Mailed
Nov 3, 2023
Sou Extension 1 Granted
Nov 3, 2023
Sou Extension 1 Filed
Nov 3, 2023
Sou Teas Extension Received
Jul 25, 2023
Noa E-Mailed - Sou Required From Applicant
May 30, 2023
Official Gazette Publication Confirmation E-Mailed
May 30, 2023
Published For Opposition
May 10, 2023
Notification Of Notice Of Publication E-Mailed
Apr 27, 2023
Approved For Pub - Principal Register
Feb 2, 2023
Examiner's Amendment Entered
Feb 2, 2023
Notification Of Examiners Amendment E-Mailed
Feb 2, 2023
Examiners Amendment E-Mailed
Feb 2, 2023
Examiners Amendment -Written
Jan 18, 2023
Automatic Update Of Assignment Of Ownership
Jan 11, 2023
Assigned To Examiner
Apr 1, 2022
New Application Office Supplied Data Entered
Mar 31, 2022
New Application Entered

Trademark Alertz updated from USPTO on 2030-01-24