Trademark: 88859149
Word
D
Status
Registered
Status Code
700
Status Date
Tuesday, November 16, 2021
Serial Number
88859149
Registration Number
6563637
Registration Date
Tuesday, November 16, 2021
Mark Type
3000
Filing Date
Friday, April 3, 2020
Published for Opposition
Tuesday, January 26, 2021

Trademark Owner History

Classifications
42 Civil engineering and infrastructure planning services; airport infrastructure services, namely, location studies, airport master planning, inspection, design and construction surveys and design of runways, taxiways, parking aprons, t-hangars, grading, pavement rehabilitation, drainage, detention basins, street systems, parking facilities, utilities, fencing and security/access control systems, fuel storage, site infrastructure for airport terminals and building facilities; drainage and flood control engineering services, namely, design of detention/retention basins, open channels, river works, storm drains, drop structures, energy dissipators, spillways, culverts, scour and bank protection, dams; drainage and flood control engineering services, namely, area drainage master studies and plans, preliminary and final design, construction administration services, flood insurance studies, drainage manuals, 404 permits/401 certification, floodplain delineations, FEMA CLOMR/LOMR, bridge scour analysis, hydrologic and hydraulic modeling and analysis, sediment transport, erosion and degradation studies, one and two dimensional modeling, benefit-cost analysis, inundation studies, emergency action plans (EAP), flood damage and risk assessment, dam and levee break modeling and flood hazard mapping, floodplain delineation and mapping, erosion setback evaluation and mapping, irrigation supply and distribution systems analysis, low impact development (LID) services, public funding assistance services, and utility coordination; land development engineering services in the nature of civil engineering services related to the development of publicly and privately owned facilities in partnership with design professionals, contractors and developers, namely, select entitlement services, site due diligence, site, grading and utility master planning, site layout, vehicle turning movement analysis, water/sewer system modeling, utility coordination, site/parking design, grading and drainage design/earthwork modeling, storm drain system design, stormwater detention/retention design, utility service design of water, fire and sewer systems, offsite roadway, drainage and utility design, municipal coordination, bidding phase support, and recording engineering drawings for others; engineering survey services, namely, control surveys, three dimensional imaging, topographic surveys, boundary surveys, right-of-way/easement surveys, global positioning surveys, photogrammetry control surveys, ALTA/ACSM surveys, construction staking, as-built surveys; geographic information system services, namely, asset inventory and management involving water and wastewater, storm drainage, water distribution, and gas pipeline systems, data collection and conversion, street centerlines, database design, development, and management, VB/VBA programming and avenue scripting, web development, data deployment, maintenance, and management, integration of water distribution systems into GIS, integration of sanitary sewer systems into GIS, integration of storm drainage systems into GIS, fire hazard evaluation and mapping; transportation engineering services, namely, major street design, highway location studies, highway design concept reports, highway/freeway design, street systems, sidewalk improvements, roadway signing/striping design, traffic impact analysis, traffic interchange design, traffic control plans, drainage analysis and design, right-of-way analysis and plans, legal descriptions and exhibits, utility design and relocations, construction administration/inspection, quality assurance/quality control, constructability reviews, comprehensive project management, partnering/teamwork leadership, public involvement, agency coordination, program management, English and metric capabilities, parks and trails, utility and agency coordination; water resource engineering services, namely, transmission/distribution main design, booster pump station design, reservoir design, well design, pipeline rehabilitation, water system appraisals, water and sewer master planning, sanitary sewer main design, lift station design, effluent reuse/reclaimed pipelines, water/waste water treatment, irrigation delivery systems, gas pipeline design, infrastructure rehabilitation, agency coordination, phased implementation planning and public involvement programs, steel reservoir rehabilitation, pipeline alignment studies, design reports, hydraulic analysis, fluid mechanics, hydrogeology, corrosion protection design, opinion of probable construction costs, construction management, requests for information, material submittals, remote facility commissioning; structural engineering services relating to buildings and ancillary structures, site and retaining walls, slab-on-grade, structural assessment reports, structural design and analysis, structural drawings from conceptual through final, construction administration, special structural inspections, general structural observations, safety inspections, specialized fiber reinforced polymer materials for strengthening or repair of existing pipelines, junction boxes, drainage facilities, canals, buildings and ancillary structures, bridges, culverts, slab-on-grade, and site and retaining walls
45 Permitting, namely, obtaining municipal permitting and NPDES/stormwater permits
Color is not claimed as a feature of the mark.
The mark consists of the capital letter "D" within a box where the horizontal bottom line forms an inverted pyramid in the center, with a strip of white under the bottom horizontal line.
DIBBLE

Trademark Events
Nov 16, 2021
Registered-Principal Register
Oct 12, 2021
Notice Of Acceptance Of Statement Of Use E-Mailed
Oct 11, 2021
Allowed Principal Register - Sou Accepted
Oct 6, 2021
Statement Of Use Processing Complete
Sep 23, 2021
Use Amendment Filed
Oct 6, 2021
Case Assigned To Intent To Use Paralegal
Sep 23, 2021
Teas Statement Of Use Received
Mar 23, 2021
Noa E-Mailed - Sou Required From Applicant
Jan 26, 2021
Official Gazette Publication Confirmation E-Mailed
Jan 26, 2021
Published For Opposition
Jan 6, 2021
Notification Of Notice Of Publication E-Mailed
Dec 22, 2020
Approved For Pub - Principal Register
Nov 7, 2020
Teas/Email Correspondence Entered
Nov 6, 2020
Correspondence Received In Law Office
Nov 6, 2020
Teas Response To Office Action Received
Jul 13, 2020
Notification Of Non-Final Action E-Mailed
Jul 13, 2020
Non-Final Action E-Mailed
Jul 13, 2020
Non-Final Action Written
Jun 23, 2020
Assigned To Examiner
Apr 11, 2020
Notice Of Design Search Code E-Mailed
Apr 10, 2020
New Application Office Supplied Data Entered In Tram
Apr 7, 2020
New Application Entered In Tram

Trademark Alertz updated from USPTO on 2030-01-24