Trademark: 87126244
Word
REBUILDING THE SYSTEM 1 P
Status
Dead
Status Code
710
Status Date
Friday, April 5, 2024
Serial Number
87126244
Registration Number
5294139
Registration Date
Tuesday, September 26, 2017
Mark Type
3
Filing Date
Wednesday, August 3, 2016
Published for Opposition
Tuesday, July 11, 2017
Cancellation Date
Friday, April 5, 2024

Trademark Owner History

Classifications
39 Providing a website featuring information in the field of transportation
37 Construction supervision services, namely, construction project management, construction program management and construction management, all for creation, demolition, and decommissioning of facilities and sites; Construction administration, namely, construction consultation, construction planning, and construction of state, commercial and industrial properties, and inspections during building construction; Construction program management and construction management services and maintenance services for large and complex engineering projects to build, maintain and improve commercial, industrial and manufacturing facilities, and federal, state and municipal infrastructure, namely, bridges, highways, interchanges, tunnels, intelligent transportation systems (ITS), mass transit systems; maintenance and improvement in the nature of repair of public buildings, commercial, industrial and manufacturing facilities, and federal, state and municipal infrastructure, namely, bridges, highways, mass transit systems; rehabilitation of the public transportation infrastructure to provide safe, reliable service, and enhance the travel experience for current and prospective customers, namely, maintaining and improving a public transportation system, namely, construction, repair, and remodeling of railways and rail stations; repair and maintenance of track and maintenance buildings, namely, fire sprinkler systems, boiler replacement, addition of emergency generators, upgrades to vehicle washers, and surface paving; repair and maintenance of parking facilities and regional rail stations and surface lots; transit access improvements throughout the transit and rail system, namely, remodeling, repair of ramps, elevators, curb ramps, handrails, guardrails, transit buildings; construction, repair, and remodeling of bridges, critical power stations, and vehicles
The mark consists of the wording "REBUILDING THE SYSTEM" in white in a gray rectangle outlined in black. Above the wording is a design of a white square with rounded edges containing two arrow heads in white facing in opposite directions and overlapping, with a red line between them, on a background that is blue on the left and red on the right. Next to that square is a design of a railroad crossing sign in white with gray arrows on it, on a gray rectangle background, outlined in black. Next to that design are two smaller squares, the top in gray outlined in black and the bottom in light blue outlined in gray. In the top rectangle is a white square with gray arrows and a bell tower design in gray and white. In the blue rectangle is a white power generator with a blue and white arrow in the middle of it. Next to those rectangles is a design of a white bus at a white bus stop, on a light blue background outlined in black. Below that is a white bridge design in a gray rectangle outlined in black. Next to the bus design is a grey square outlined in black with white designs in the middle of a ladder, bricks, a helmet, and tools. Next to the bridge design is a gray square outlined in black with a white electric tower inside. Above the electric tower is a blue square outlined in black with a design of a white bench next to a white train station. Next to the train station design is a gray square outlined in black with a design of a white and gray roof inside. Below the roof design is a blue square outlined in black with a white square in the middle and a dark gray "P" in the white square. Below the "P" is a gray rectangle outlined in black with a white train car design inside. Below the train car is a blue square outlined in black with a white handicapped symbol inside and a gray square outlined in black with a white train track design. The colors black and white represent background and are not part of the mark.
REBUILDING THE SYSTEM ONE P
The color(s) red, blue, grey, and light blue is/are claimed as a feature of the mark.
THE HANDICAPPED AND PARKING SYMBOLS

Trademark Events
Nov 14, 2016
Assigned To Examiner
Nov 18, 2016
Non-Final Action E-Mailed
Aug 6, 2016
New Application Entered
Aug 8, 2016
New Application Office Supplied Data Entered
Aug 9, 2016
Notice Of Design Search Code E-Mailed
Nov 18, 2016
Non-Final Action Written
Nov 18, 2016
Notification Of Non-Final Action E-Mailed
May 26, 2017
Approved For Pub - Principal Register
Apr 25, 2017
Teas Response To Office Action Received
May 16, 2017
Assigned To Lie
May 24, 2017
Correspondence Received In Law Office
May 24, 2017
Teas/Email Correspondence Entered
May 26, 2017
Examiners Amendment -Written
May 26, 2017
Examiners Amendment E-Mailed
May 26, 2017
Notification Of Examiners Amendment E-Mailed
May 26, 2017
Examiner's Amendment Entered
Jun 6, 2017
Law Office Publication Review Completed
Jun 21, 2017
Notification Of Notice Of Publication E-Mailed
Jul 11, 2017
Official Gazette Publication Confirmation E-Mailed
Sep 26, 2017
Registered-Principal Register
Sep 26, 2022
Courtesy Reminder - Sec. 8 (6-Yr) E-Mailed
Apr 5, 2024
Cancelled Sec. 8 (6-Yr)
Jul 11, 2017
Published For Opposition

Trademark Alertz updated from USPTO on 2030-01-24