Trademark: 79378126
Word
CALSI
Status
Pending
Status Code
641
Status Date
Monday, April 29, 2024
Serial Number
79378126
Mark Type
4
Filing Date
Friday, July 28, 2023

Trademark Owner History

Classifications
19 Building and construction materials and elements, not of metal; doors, gates, windows and window coverings, not of metal; ceiling panels and suspended ceiling constructions, not of metal; decorative mouldings (non-metallic -); fire-retardant materials, not of metal; fireproof seals in the nature of building materials; fire protection screenings (non-metallic -) for electric cables; fire protection materials (non-metallic -) for use in building; refractory construction materials, not of metal; refractory furnace linings [non-metallic]; fire retardant panels (non-metallic -) for use in construction; fireplace surrounds; chimney cowls, not of metal; fireplace mantles, not of metal; smoke exits [vents], not of metal; refractory mortars [non-metallic]; remediation materials, not of metal; mouldings, grouts, plaster, not of metal; rigid pipes, not of metal, for building; buildings, transportable, not of metal; remediation and insulating materials for monuments, not of metal; high-temperature ceramics as building materials; crucibles [laboratory], casting nozzles, floats, casting moulds, founders and parts for the aforementioned goods; moulded sections (building elements); moulds (building elements) as plates, shells, shell segments, rings, blocks (not of metal); granules and powders, ramming masses, coatings of the aforesaid materials; none of the aforesaid goods including, or for use in relation to, rainwater systems, drainage systems, soil and waste systems, waste and soil pipes, plastic window trims, plastic cladding for buildings, or other plastic building products in the nature of rainwater systems, drainage systems, soil and waste systems, waste and soil pipes, plastic window trims, or plastic cladding for buildings; the scope of protection of the aforesaid goods excludes those based on gypsum and/or kaolin and/or cement

Trademark Events
Mar 30, 2024
Assigned To Examiner
Sep 7, 2023
Sn Assigned For Sect 66a Appl From Ib
Sep 8, 2023
New Application Office Supplied Data Entered
Sep 12, 2023
Application Filing Receipt Mailed
Nov 10, 2023
New Representative At Ib Received
Mar 23, 2024
New Representative At Ib Received
Apr 19, 2024
Non-Final Action (Ib Refusal) Prepared For Review
Apr 18, 2024
Non-Final Action Written
Apr 29, 2024
Non-Final Action Mailed - Refusal Sent To Ib
May 22, 2024
Refusal Processed By Ib
Apr 29, 2024
Refusal Processed By Mpu