Trademark: 79368622
Word
DUOL
Status
Pending
Status Code
641
Status Date
Wednesday, December 20, 2023
Serial Number
79368622
Mark Type
3000
Filing Date
Wednesday, March 15, 2023

Trademark Owner History

Classifications
19 Transportable buildings (constructions), not of metal; buildings, not of metal; structures with frames not of metal; greenhouse frames, not of metal; roofing, not of metal, incorporating solar cells; greenhouses, transportable, not of metal; silos, not of metal; non-metal roof coverings
6 Structures and transportable buildings of metal, buildings of metal, structures with frames of metal, modular building units (metal -), eaves of metal; greenhouses of metal, transportable; steel buildings
17 Packing, stopping and insulating materials; insulation and barrier articles and materials; thermal insulation articles and materials; acoustic insulation articles and materials; insulating refractory materials, insulating fabrics, compositions to prevent the radiation of heat
37 Building construction, building construction supervision, construction information; consultancy relating to the installation, construction and assembly of inflatable structures, greenhouses, silos, transportable buildings and facilities adapted for conditions in space
11 Apparatus for lighting, heating, cooling, drying and ventilating purposes; heating, ventilating, and air conditioning and purification equipment (ambient); hvac systems (heating, ventilation and air conditioning)
42 Scientific and technological services and research and design relating thereto; architectural and building research and architectural and building design in the field of inflatable structures, greenhouses, silos, transportable buildings and aerospace programmes; engineering, structural design and consultancy relating to the aforesaid services
The color(s) black, white, red is/are claimed as a feature of the mark.

Trademark Events
Jan 8, 2024
Refusal Processed By Ib
Dec 20, 2023
Non-Final Action Mailed - Refusal Sent To Ib
Dec 20, 2023
Refusal Processed By Mpu
Dec 14, 2023
Non-Final Action (Ib Refusal) Prepared For Review
Dec 13, 2023
Non-Final Action Written
Dec 12, 2023
Assigned To Examiner
May 9, 2023
Application Filing Receipt Mailed
May 5, 2023
New Application Office Supplied Data Entered
May 4, 2023
Sn Assigned For Sect 66a Appl From Ib

Trademark Alertz updated from USPTO on 2030-01-24