Trademark: 79359649
Word
FASTEX
Status
Pending
Status Code
686
Status Date
Tuesday, March 12, 2024
Serial Number
79359649
Mark Type
4000
Filing Date
Thursday, August 4, 2022
Published for Opposition
Tuesday, March 12, 2024

Trademark Owner History
Flender GmbH - Owner At Publication

Classifications
7 Couplings for machines and parts thereof; gear boxes for machines and various parts therefor; gears for machines, not for land vehicles, in particular gears for mills; milling machine; electric drive motors for mills; wind turbines; electricity generators; wind-powered electricity generators; gear boxes, other than for land vehicles; gear box casings, other than for land vehicles; motors, other than for land vehicles; brakes for machines; machine parts, namely, safety couplings, torque limiting elements for couplings; cam sprockets; belt pulleys being parts of machines; chains for power machinery and driving motors and starters therefor (other than for land vehicles); machine parts, namely, drive link chains, transmission link chains for continuously adjustable transmissions, torque limiters in the nature of shaft-hub connections and shaft-to-collar connections and shaft-hub joints, clamping elements in the nature of shaft-hub connections and shaft-to-collar connections and shaft-hub joints for couplings, transmissions for machines and belt pulleys being parts of machines, clamping elements for drives in the nature of chain drives and belt drives, chain clamping elements in the nature of shaft-hub connections and shaft-to-collar connections and shaft-hub joints; timing belts for machines; machine parts, namely, v-belts, conical clamping elements in the nature of shaft-hub connections and shaft-to-collar connections and shaft-hub joints, grain clamping elements in the nature of shaft-hub connections and shaft-to-collar connections and shaft-hub joints, clamping elements in the nature of shaft-hub connections and shaft-to-collar connections and shaft-hub joints for foundation bolts, clamping elements in the nature of shaft-hub connections and shaft-to-collar connections and shaft-hub joints for threads, electromechanical clamping elements in the nature of shaft-hub connections and shaft-to-collar connections and shaft-hub joints, gearboxes; belt pulleys, especially belt pulleys being parts of machines for timing belts and fan belts; couplings for machines and parts thereof; gear boxes for machines and parts therefor; engines and motors for machines; brakes for machines; machine parts, in particular, axles, cams, linkages in the nature of linkages of metal, cam shafts, cams, belt tensioners, friction couplings in the nature of shaft-hub connections and shaft-to-collar connections and shaft-hub joints, magnetic couplings, shaft couplings in the nature of shaft-hub connections and shaft-to-collar connections and shaft-hub joints, brakes and brake linings, coupling and brake operating levers, bearings, bevel wheels, worm wheels, frictional wheels, fly-wheels, flywheels, gear drives, machine parts and belts for industrial purposes also made of leather, in particular, machine belts, v-belts, flat belts, link belts, wide fan belts
37 Construction, repair and maintenance of wind power installations being structures, in particular generators of electricity and gear boxes

Trademark Events
Mar 12, 2024
Official Gazette Publication Confirmation E-Mailed
Mar 12, 2024
Notification Processed By Ib
Mar 12, 2024
Published For Opposition
Feb 21, 2024
Notification Of Possible Opposition Sent To Ib
Feb 21, 2024
Notification Of Notice Of Publication E-Mailed
Feb 21, 2024
Official Gazette Publication Confirmation E-Mailed
Feb 21, 2024
Notice Of Start Of Opposition Period Created, To Be Sent To Ib
Feb 5, 2024
Approved For Pub - Principal Register
Jan 9, 2024
Teas/Email Correspondence Entered
Jan 8, 2024
Correspondence Received In Law Office
Jan 8, 2024
Teas Response To Office Action Received
Aug 1, 2023
Refusal Processed By Ib
Jul 8, 2023
Non-Final Action Mailed - Refusal Sent To Ib
Jul 8, 2023
Refusal Processed By Mpu
May 31, 2023
Non-Final Action (Ib Refusal) Prepared For Review
May 30, 2023
Non-Final Action Written
May 23, 2023
Assigned To Examiner
Jan 10, 2023
Application Filing Receipt Mailed
Jan 6, 2023
New Application Office Supplied Data Entered
Jan 5, 2023
Sn Assigned For Sect 66a Appl From Ib

Trademark Alertz updated from USPTO on 2030-01-24