Trademark: 79331632
Word

Status
Registered
Status Code
700
Status Date
Tuesday, May 23, 2023
Serial Number
79331632
Registration Number
7057766
Registration Date
Tuesday, May 23, 2023
Mark Type
2000
Filing Date
Tuesday, October 26, 2021
Published for Opposition
Tuesday, March 7, 2023

Trademark Owner History
CUIRASSIER - Original Registrant

Classifications
9 Instruments for measuring water levels; Electric measuring apparatus, namely, apparatus for measuring water levels, water mass, retention basins and any industrial and chemical liquids; sensors, detectors and monitoring instruments, namely, pressure sensor, laser sensors for water, motion sensor, turbidity control sensor and sensor for calculating the flow velocity of a liquid; Electronic-based instruments for measuring environmental parameters including humidity, water level, movements, shocks and debris impacts, and liquid current; level indicators for water and any other liquid; Luminous and mechanical warning signs; pressure measuring apparatus; observation instruments, namely a downloadable computer software to alert users on protection from flooding; electric and electronic alarms for detecting the presence and level of water and any other liquid; Remote control for remote controlled valves
19 Prefabricated building assemblies, not of metal; transportable buildings not of metal; Construction materials, namely, thermoformed plastic, injection molded plastic, and composite plastic; flood protection apparatus and systems, being non-metallic building elements, namely, thermoformed plastic, injection molded plastic, and composite plastic; devices for preventing water and all liquids from entering buildings, namely, non-metal free-standing barriers; temporary devices for protection against infiltrations and floods, namely non-metallic ready-to-assemble protection barriers; non-metallic semi-permanent barriers for flood prevention and portable flood barriers; non-metallic transportable buildings, namely, mobile protective barriers made of plastic against infiltration and floods; non-metallic transportable buildings, namely, flexible modular protection barriers for fast installation against floods; Portable non-metal free-standing barriers to absorb flood water; replacement parts therefor
6 Common metals and their alloys; Metal building materials, namely, stainless steel, and liquid metal elastomer; metal supports for use in the construction of barriers that prevent the penetration of water and any other liquid; flood barriers of metal
17 Packing and insulating materials of rubber or plastic; caulking materials to prevent and resist water, mud and or other liquid; Sealing and insulating materials
37 Construction, installation, repair and maintenance of flood protection systems; installation, repair and maintenance of flood warning systems; civil engineering in connection with the prevention of flooding of land and buildings; advisory services with respect to the installation of flood prevention equipment; Consultation and advice in the field of installation of flood prevention equipment; Flood protection system construction, installation, repair, and maintenance information and consultation services
45 Safety services for the civil protection of property and persons; Security services for buildings, namely security services for the physical protection of tangible property; Security threat analysis for protecting personal safety and tangible property; legal advice for responding to calls for tenders with respect to environmental risks
42 Design and development of flood protection systems; design and development of engineering works for flood prevention; Engineering advisory services with respect to flood prevention; technical advisory services with respect to civil engineering; Scientific and industrial research of methods for detecting and preventing flooding; design and development of computers and software; design and development of computer hardware and software for flood warning systems; providing temporary use of non-downloadable software for flood prevention; software as a service services featuring software for flood monitoring and flood warning services; Consultation and advice in the field of design and development of flood prevention systems, and flood prevention computer software
The mark consists of a dark blue stylized drop of water, inside the drop of water is a stylized curved wave pattern composed of alternating bands of white, light blue, white, orange, white, light blue and white. The remaining white represents background or transparency only.
The colors blue, orange, and white are claimed as a feature of the mark.

Trademark Events
Sep 17, 2023
Final Decision Transaction Processed By Ib
Aug 25, 2023
Final Disposition Notice Sent To Ib
Aug 25, 2023
Final Disposition Processed
Aug 23, 2023
Final Disposition Notice Created, To Be Sent To Ib
May 23, 2023
Notice Of Registration Confirmation Emailed
May 23, 2023
Registered-Principal Register
Mar 7, 2023
Official Gazette Publication Confirmation E-Mailed
Mar 7, 2023
Published For Opposition
Mar 6, 2023
Notification Processed By Ib
Feb 16, 2023
Correction Sent To Ib
Feb 15, 2023
Notification Of Possible Opposition Sent To Ib
Feb 15, 2023
Correction Created For Ib
Feb 15, 2023
Notice Of Start Of Opposition Period Created, To Be Sent To Ib
Feb 15, 2023
Notification Of Notice Of Publication E-Mailed
Feb 1, 2023
Approved For Pub - Principal Register
Jan 31, 2023
Examiner's Amendment Entered
Jan 31, 2023
Notification Of Examiners Amendment E-Mailed
Jan 31, 2023
Examiners Amendment E-Mailed
Jan 31, 2023
Examiners Amendment -Written
Oct 31, 2022
Applicant/Correspondence Changes (Non-Responsive) Entered
Oct 31, 2022
Teas Change Of Correspondence Received
Oct 31, 2022
Teas Change Of Domestic Representatives Address
Oct 31, 2022
Attorney/Dom.Rep.Revoked And/Or Appointed
Oct 31, 2022
Teas Revoke/App/Change Addr Of Atty/Dom Rep Received
Oct 31, 2022
Teas Change Of Owner Address Received
Sep 21, 2022
Refusal Processed By Ib
Aug 29, 2022
Non-Final Action Mailed - Refusal Sent To Ib
Aug 29, 2022
Refusal Processed By Mpu
Aug 3, 2022
Non-Final Action (Ib Refusal) Prepared For Review
Aug 2, 2022
Non-Final Action Written
Jul 27, 2022
Assigned To Examiner
Feb 4, 2022
Application Filing Receipt Mailed
Jan 31, 2022
New Application Office Supplied Data Entered
Jan 27, 2022
Sn Assigned For Sect 66a Appl From Ib

Trademark Alertz updated from USPTO on 2030-01-24