Trademark: 79326235
Word
BEEM
Status
Pending
Status Code
654
Status Date
Tuesday, November 21, 2023
Serial Number
79326235
Mark Type
4000
Filing Date
Tuesday, June 8, 2021

Trademark Owner History

Classifications
40 Production of electricity; production of electricity from solar energy; production of energy; production of electrical energy from renewable sources
9 Photovoltaic energy accumulators; electricity storage apparatus; photovoltaic apparatus and installations for solar electricity production; scientific apparatus and instruments; apparatus and instruments for conducting electricity; photovoltaic apparatus for electricity production; photovoltaic apparatus for converting solar radiation to electrical energy; apparatus for measuring, monitoring and analyzing electricity consumption; software applications for mobile telephones; batteries; electric cables; solar energy collectors for electricity generation; calibrated photovoltaic reference cells; photovoltaic cells; solar cells; solar cells for the production of electricity; counters; electric control devices for heating management; sets of solar panels for electricity generation; data processing equipment; photovoltaic installations for generating electricity [photovoltaic power plants]; photovoltaic inverters; software; software for authorizing access to databases; photovoltaic modules; solar modules; photovoltaic solar modules; solar panels; portable solar panels for generating electricity; solar panels for electricity production; solar panels for electricity production; electric control panels
39 Distribution of energy; distribution of renewable energy; electricity storage; electricity distribution
4 Electrical energy; electrical energy produced from solar energy; electrical energy produced from renewable sources
37 Maintenance of apparatus and installations for electric energy production; installation of electric energy production apparatus; installation of photovoltaic cells and modules; installation of solar energy systems; installation and maintenance of photovoltaic installations; maintenance and repair of energy generating installations; maintenance, repair and reconditioning of photovoltaic facilities and apparatus; repair of apparatus and installations for electric energy production; repair of energy supply installations; servicing of apparatus and installations for electric energy production
42 Energy auditing; design and development of photovoltaic systems; design and development of software for controlling, adjusting and controlling solar energy systems; design and development of systems for regenerative energy production; design and development of energy management software; advice related to energy saving; development of energy and power management systems; provision of information regarding studies, technical projects and research on the use of natural energy; technical consultancy in connection with energy-saving measures; programming of energy management software; conducting technical project studies and research related to the use of natural energy; technical consulting services in connection with energy saving measures; technological consultancy services in the field of alternative energy production

Trademark Events
Nov 21, 2023
Report Completed Suspension Check Case Still Suspended
May 9, 2023
Notification Of Possible Opposition - Processed By Ib
Apr 19, 2023
Notification Of Possible Opposition Sent To Ib
Apr 19, 2023
Notification Of Possible Opposition Created, To Be Sent To Ib
Apr 18, 2023
Notification Of Letter Of Suspension E-Mailed
Apr 18, 2023
Letter Of Suspension E-Mailed
Apr 18, 2023
Suspension Letter Written
Mar 18, 2023
Suspension Checked ¿ To Attorney For Action
Jul 26, 2022
Notification Of Letter Of Suspension E-Mailed
Jul 26, 2022
Letter Of Suspension E-Mailed
Jul 26, 2022
Suspension Letter Written
Jun 28, 2022
Teas/Email Correspondence Entered
Jun 28, 2022
Correspondence Received In Law Office
Jun 28, 2022
Teas Response To Office Action Received
Apr 18, 2022
Refusal Processed By Ib
Mar 31, 2022
Non-Final Action Mailed - Refusal Sent To Ib
Mar 31, 2022
Refusal Processed By Mpu
Mar 4, 2022
Non-Final Action (Ib Refusal) Prepared For Review
Mar 3, 2022
Non-Final Action Written
Feb 25, 2022
Assigned To Examiner
Nov 26, 2021
Application Filing Receipt Mailed
Nov 22, 2021
New Application Office Supplied Data Entered
Nov 18, 2021
Sn Assigned For Sect 66a Appl From Ib

Trademark Alertz updated from USPTO on 2030-01-24