Trademark: 79301086
Word
POWERING GOOD FOR SUSTAINABLE ENERGY
Status
Registered
Status Code
700
Status Date
Tuesday, August 17, 2021
Serial Number
79301086
Registration Number
6451087
Registration Date
Tuesday, August 17, 2021
Mark Type
4000
Filing Date
Tuesday, August 4, 2020
Published for Opposition
Tuesday, June 1, 2021

Trademark Owner History
Hitachi Energy Holdings Ltd - Original Registrant
ABB PG Power Grids Ltd - Owner At Publication

Classifications
41 Education in the nature of seminars and workshops, training, and continuous training in the field of power generation, power transmission and power distribution
9 Computer hardware for data processing and computers; downloadable and recorded computer software for power generation, power transmission and power distribution; microprocessors; chargers for electric storage batteries; electrical condensers in the nature of electrical capacitors; electric collectors;, namely, solar collectors; electric terminals; electric conductors, cables and wires; accumulator boxes and electrical terminal boxes; cable sheaths for electric conductors and cable identification wires for electric conductors; cable sheaths for electrical cables; semi-conductors; photovoltaic installations for generating electricity, namely, photovoltaic solar modules for production of electricity; fuel cells; electric power converters; electrical connection parts, namely, electrical connectors, network sockets, junction boxes, grounding clamps, electric cables, electric switches; junction sleeves for electric cables; transistors, thyristors, electric diodes; electrical transformers; electric resistances; electrical distribution boards and electrical distribution boxes; batteries; integrated circuits chips; printed circuit boards; anti-interference equipment, namely, electric filters for the reduction of harmonics; memories for data processing equipment; switchgear, namely, electricity distribution boxes, switch buttons, and electric cables; electric switches; electric relays; modems; electrical conduit pipes in the nature of electricity breakers, sensors, namely, pressure sensors, flow sensors, speed sensors, force sensors, temperature sensors, piezoelectric sensors; fuses, as far as included in this class; circuit breakers; switching equipment, namely, fuse switch disconnector, switch disconnector, electric switches; voltmeters; electric cables; transformers; solar cells; electronic control apparatus for machines and motors and engines; solar panels for electricity production
7 Motors and engines, drive systems and hydraulic motors and engines, none of the foregoing for land vehicles; electric couplings and devices for power transmission, namely, belt drives, chain drives, gear drives and gear trains, except those for land vehicles; wind-powered electricity and power generators; conveyor belts for transport; turbocompressors; electric pumps; electric compressors; hydroelectric installations for generating electricity; wind-powered electric generators
17 Insulation materials made of composite material; Insulation materials made of epoxy resin; Insulation materials made of pressboard and paper; Insulation materials made of Polymer
37 Building construction; maintenance of computer hardware, especially computers and computer network equipment; pipeline construction and maintenance; installation, servicing and repair of energy converters, power plants, wave energy converters and wave energy power plants; installation, construction, servicing, repair and maintenance of electricity and energy generating equipment and systems; installation, servicing and repair of solar energy systems for energy production; underwater construction; advice in the field of all the aforesaid services
12 Steering mechanisms for ships, namely, electric steering gears; motors and engines for land vehicles, in particular for rail vehicles
11 Heating equipment, namely, solar collectors for heating, cooling equipment for industrial applications, in particular for drives, rectifiers, converters, data center, metallurgic process applications and cooling equipment for power transmission applications, in particular for high voltage direct current systems and for static var compensation systems
42 Scientific and industrial research in the field of energy production and energy transmission; creation of data processing computer programs; testing of materials; engineering advisory services, namely, engineering advice with respect to environmental compatibility, energy saving and technical advice in the field of energy saving and energy efficiency; computer software design, especially in the field of computer security; network engineers' services, namely, providing advice in the field of computer and network security; scientific and industrial research in the field of network technology; updating of computer software; maintenance of computer software; computer system analyses; research and development services relating to new products; technical writing, namely, preparation of technical reports; rental of data processing equipment and software; software development; engineering services

Trademark Events
Jul 30, 2022
New Representative At Ib Received
May 13, 2022
New Representative At Ib Received
Apr 15, 2022
Change Of Name/Address Rec'd From Ib
Mar 21, 2022
Final Decision Transaction Processed By Ib
Jan 28, 2022
Final Disposition Notice Sent To Ib
Jan 28, 2022
Final Disposition Processed
Nov 17, 2021
Final Disposition Notice Created, To Be Sent To Ib
Aug 17, 2021
Registered-Principal Register
Jun 1, 2021
Official Gazette Publication Confirmation E-Mailed
Jun 1, 2021
Published For Opposition
May 12, 2021
Notification Of Notice Of Publication E-Mailed
Apr 29, 2021
Approved For Pub - Principal Register
Apr 29, 2021
Examiner's Amendment Entered
Apr 29, 2021
Notification Of Examiners Amendment E-Mailed
Apr 29, 2021
Examiners Amendment E-Mailed
Apr 29, 2021
Examiners Amendment -Written
Apr 23, 2021
Teas/Email Correspondence Entered
Apr 22, 2021
Correspondence Received In Law Office
Apr 22, 2021
Teas Response To Office Action Received
Apr 23, 2021
Change Of Name/Address Rec'd From Ib
Apr 10, 2021
New Representative At Ib Received
Apr 3, 2021
New Representative At Ib Received
Feb 14, 2021
Refusal Processed By Ib
Jan 28, 2021
Non-Final Action Mailed - Refusal Sent To Ib
Jan 28, 2021
Refusal Processed By Mpu
Jan 8, 2021
Non-Final Action (Ib Refusal) Prepared For Review
Jan 7, 2021
Non-Final Action Written
Jan 6, 2021
Application Filing Receipt Mailed
Jan 3, 2021
Assigned To Examiner
Jan 2, 2021
New Application Office Supplied Data Entered In Tram
Dec 31, 2020
Sn Assigned For Sect 66a Appl From Ib

Trademark Alertz updated from USPTO on 2030-01-24