Trademark: 79276962
Word
PICHLER
Status
Registered
Status Code
700
Status Date
Tuesday, November 30, 2021
Serial Number
79276962
Registration Number
6571253
Registration Date
Tuesday, November 30, 2021
Mark Type
3000
Filing Date
Monday, October 14, 2019
Published for Opposition
Tuesday, September 14, 2021

Trademark Owner History
Pichler Projects - Srl - Original Registrant

Classifications
19 Non-metallic prefabricated buildings; transportable buildings of wood; transportable buildings, not of metal; concrete building elements, namely, concrete pipes, concrete panels, concrete vaults, concrete piles, concrete walls, concrete footings, concrete blocks, concrete beams, concrete bollards, concrete floors ; semi-worked construction wood; glass bricks; ceramic floor tiles and façade coverings; wall coverings non-metallic, namely, wall tiles not of metal, wall panels not of metal, non-metal wall cladding for building, wall boards; non-metallic reinforcement materials for construction, namely, reinforcing materials not of metal for building purposes; non-metallic modular animal stalls, non-metallic prefabricated stables; wooden window frames; wooden pipes for construction; insulating construction glass; insulating glass for construction
6 Metal door frames; metal rods, namely, metal welding rods, metal brazing, metal reinforcing rod; metal architectural columns for construction; metal containers for storage or transport; roofing materials of metal, namely, metal roofing, metal roof flashing, metal roof trusses, metal roofing hips, metal roofing tiles, metal roofing panels, roofing covers of metal; transportable steel constructions; metal constructions, namely, metal piles, metal supports, metal braces, metal shores, fabricated metal components for building foundations, and metal cladding for construction and building; transportable metal constructions; metal windows; metal scaffolding; metal building materials, namely, metal floor panels, metal fascia, metal soffits, metal canopies, metal awnings, metal ceiling and floor boards, and metal reinforcing materials for building; metal refractory construction materials; metal doors; metal railings for bridges; metal wall cladding for construction; metal construction cladding; metal stairs; metal portable stairs; metal supports for construction; frames of metal for windows; metal partitions for building
37 Building renovation; construction consultancy services relating to the construction of buildings and other structures; consultancy services relating to the maintenance, repair and renovation of buildings and engineering structures; building construction supervision services relating to shopping centers, industrial complexes, offices, residential buildings and other real estate structures; building construction supervision services concerning real estate projects; supervision of construction works for real estate projects; waterproofing services for basements and buildings
42 Consultancy in the field of technological design, namely, architectural design, building design, construction design; preparation of reports relating to technical architectural design studies for buildings; architectural services for the design of buildings; architectural services for the design of commercial buildings; architectural services for the design of industrial buildings; architectural services and engineering; civil engineering services; technical design studies in the field of construction, namely, architectural design, building design, construction design
Color is not claimed as a feature of the mark.

Trademark Events
Jun 12, 2022
Final Decision Transaction Processed By Ib
May 19, 2022
Final Disposition Notice Sent To Ib
May 18, 2022
Final Disposition Processed
Feb 28, 2022
Final Disposition Notice Created, To Be Sent To Ib
Nov 30, 2021
Registered-Principal Register
Sep 20, 2021
Notification Processed By Ib
Sep 14, 2021
Official Gazette Publication Confirmation E-Mailed
Sep 14, 2021
Official Gazette Publication Confirmation E-Mailed
Sep 14, 2021
Official Gazette Publication Confirmation E-Mailed
Sep 14, 2021
Published For Opposition
Aug 26, 2021
Notification Of Notice Of Publication E-Mailed
Aug 26, 2021
Notification Of Notice Of Publication E-Mailed
Aug 26, 2021
Notification Of Notice Of Publication E-Mailed
Aug 25, 2021
Notification Of Possible Opposition Sent To Ib
Aug 25, 2021
Notice Of Start Of Opposition Period Created, To Be Sent To Ib
Aug 11, 2021
Approved For Pub - Principal Register
Jul 29, 2021
Teas/Email Correspondence Entered
Jul 28, 2021
Correspondence Received In Law Office
Jul 28, 2021
Teas Request For Reconsideration Received
Jul 11, 2021
Notification Of Possible Opposition - Processed By Ib
Jun 23, 2021
Notification Of Possible Opposition Sent To Ib
Jun 23, 2021
Notification Of Possible Opposition Created, To Be Sent To Ib
Jan 30, 2021
Notification Of Final Refusal Emailed
Jan 30, 2021
Final Refusal E-Mailed
Jan 30, 2021
Final Refusal Written
Jan 11, 2021
Teas/Email Correspondence Entered
Jan 11, 2021
Correspondence Received In Law Office
Jan 8, 2021
Assigned To Lie
Sep 30, 2020
Notice Of Revival - E-Mailed
Sep 30, 2020
Teas Response To Office Action Received
Sep 30, 2020
Petition To Revive-Granted
Sep 30, 2020
Teas Petition To Revive Received
Sep 8, 2020
Abandonment Notice Mailed - Failure To Respond
Sep 8, 2020
Abandonment - Failure To Respond Or Late Response
Mar 13, 2020
Refusal Processed By Ib
Feb 26, 2020
Non-Final Action Mailed - Refusal Sent To Ib
Feb 26, 2020
Refusal Processed By Mpu
Feb 5, 2020
Non-Final Action (Ib Refusal) Prepared For Review
Feb 4, 2020
Non-Final Action Written
Feb 1, 2020
Application Filing Receipt Mailed
Jan 28, 2020
Assigned To Examiner
Jan 28, 2020
New Application Office Supplied Data Entered In Tram
Jan 23, 2020
Sn Assigned For Sect 66a Appl From Ib

Trademark Alertz updated from USPTO on 2030-01-24