Trademark: 79249262
Word
PANDROL
Status
Registered
Status Code
700
Status Date
Tuesday, April 21, 2020
Serial Number
79249262
Registration Number
6035868
Registration Date
Tuesday, April 21, 2020
Mark Type
4000
Filing Date
Monday, May 14, 2018
Published for Opposition
Tuesday, February 4, 2020

Trademark Owner History
Pandrol Limited - Original Registrant

Classifications
40 Treatment of materials in the nature of metal; rail grinding services; welding services
9 Apparatus and instruments for conveying, distributing, transforming, storing, regulating or controlling electric current; electrical controlling devices for the electrification of railway lines; electric conductor rails; electric cables; protective clothing, namely, clothing for protection against fire, electricity and accidents; electronic measuring and monitoring goods for the railway industry, namely, electronic monitors and monitor modules for monitoring electric rail current and associated electrical signals; electronic equipment for use in condition monitoring in the railway industry, namely, electronic monitors and monitor modules, computer hardware and recorded software system for remotely monitoring railway and train conditions; railway stress gauges in the nature of strain gauges; electronic rail temperature monitors; remote monitoring equipment for the railway industry, namely, wireless communication devices for relaying data about railway and train conditions; data processing equipment for the railway industry, namely, computers; software for the railway industry, namely, software for monitoring, analysing and reporting on railway and train condition; railway signaling equipment, namely, railway signals, train control magnets, mounting systems, anti-trip devices, cable guards, insulators, and signboard supports all for use with railway signals; railway testing, measuring and detection equipment, namely electronic remote condition and fault monitoring equipment capable of detecting wheel flats and bogie hunting, and for monitoring rail temperatures, strain or ground disturbance; magnetic or electronic recording supports, namely, magnetic data carriers being blank; parts, fittings and accessories for electric conductor rails, namely, insulators, brackets, anchors, expansion joints, coextruded rail, covers and cable terminals
8 Hand-operated tools for use in installing and removing railway tracks and railway track fastenings
7 machines for railway construction, repair and maintenance; rail-laying machines; machines and machine tools for installing and replacing railway sleepers; welding machines, namely, electric welding machines; power-operated rail saws; grinding machines for the treatment of metal; drilling machines; ballast tamping machines, namely, machines for packing track ballasts under railway tracks to increase their durability; rail reprofiling machines in the nature of grinding machines; rail polishing machines; machines for installing, removing, tightening and loosening rail fastenings and bolted components therefor; power-operated lifting machines for moving railway pieces, including rails and sleepers; conveyors being machines; hydraulically actuated tools for laying railway lines and sleepers, and for inserting or removing rail fastenings; engines, other than for land vehicles; shaft couplings and drive belts for engines, other than for land vehicles engines; parts, fittings and component part accessories for rail-laying machines, machines and machine tools for installing and replacing railway sleepers, welding machines, rail saws and grinding machines namely, brackets, grapple claws, rotors, gauges, mechanized lifting systems comprised of wrenches, wrench handles, spike pullers and drivers, hooks, hydraulic pumps; power operated safety systems comprised of power units, grinders, safety frames, rollers; and clipping tools, namely, mechanized clipping tools for installing and removing rail fastenings
37 Installation, repair, maintenance and routine servicing of railways and railway equipment; installation and repair of railways and railway equipment by means of welding; consultancy and advisory services in relation to railway system construction, servicing, maintenance and repair
42 Engineering services, namely, analyzing and reporting on data relating to the structural integrity and proper functioning of railways and trains thereon; engineering and systems analysis of data relating to the structural integrity and proper functioning of railways and trains thereon; design and development of computer software for railway and train condition monitoring; providing online non-downloadable software for monitoring the condition of railways and trains thereon; calibration of monitoring and measuring equipment for use in the rail industry; railway engineering consultancy and advisory services concerning the condition monitoring of railways; quality control inspection and quality testing of railways and railway equipment

Trademark Events
May 12, 2023
Change Of Name/Address Rec'd From Ib
Nov 25, 2022
New Representative At Ib Received
Sep 26, 2020
Final Decision Transaction Processed By Ib
Sep 5, 2020
Final Disposition Notice Sent To Ib
Aug 27, 2020
Final Disposition Processed
Jul 21, 2020
Final Disposition Notice Created, To Be Sent To Ib
Apr 21, 2020
Registered-Principal Register
Feb 4, 2020
Official Gazette Publication Confirmation E-Mailed
Feb 4, 2020
Published For Opposition
Jan 31, 2020
Notification Processed By Ib
Jan 15, 2020
Notification Of Possible Opposition Sent To Ib
Jan 15, 2020
Notice Of Start Of Opposition Period Created, To Be Sent To Ib
Jan 15, 2020
Notification Of Notice Of Publication E-Mailed
Dec 27, 2019
Law Office Publication Review Completed
Dec 27, 2019
Approved For Pub - Principal Register
Dec 19, 2019
Examiner's Amendment Entered
Dec 19, 2019
Assigned To Lie
Dec 19, 2019
Notification Of Examiners Amendment E-Mailed
Dec 19, 2019
Examiners Amendment E-Mailed
Dec 19, 2019
Examiners Amendment -Written
Aug 24, 2019
Notification Of Final Refusal Emailed
Aug 24, 2019
Final Refusal E-Mailed
Aug 24, 2019
Final Refusal Written
Aug 1, 2019
New Representative At Ib Received
Jul 31, 2019
Teas/Email Correspondence Entered
Jul 31, 2019
Correspondence Received In Law Office
Jul 31, 2019
Teas/Email Correspondence Entered
Jul 30, 2019
Correspondence Received In Law Office
Jul 31, 2019
Teas Response To Office Action Received
Jul 30, 2019
Teas Response To Office Action Received
Apr 8, 2019
Assigned To Examiner
Feb 16, 2019
Refusal Processed By Ib
Jan 31, 2019
Non-Final Action Mailed - Refusal Sent To Ib
Jan 30, 2019
Refusal Processed By Mpu
Jan 19, 2019
Application Filing Receipt Mailed
Jan 17, 2019
Non-Final Action (Ib Refusal) Prepared For Review
Jan 16, 2019
Non-Final Action Written
Jan 15, 2019
Assigned To Examiner
Jan 15, 2019
New Application Office Supplied Data Entered
Jan 14, 2019
Limitation From Original Application Entered
Jan 10, 2019
Sn Assigned For Sect 66a Appl From Ib

Trademark Alertz updated from USPTO on 2030-01-24