Trademark: 79245305
Word
EXYTE
Status
Registered
Status Code
700
Status Date
Tuesday, October 29, 2019
Serial Number
79245305
Registration Number
5893739
Registration Date
Tuesday, October 29, 2019
Mark Type
4000
Filing Date
Tuesday, July 31, 2018
Published for Opposition
Tuesday, August 13, 2019

Trademark Owner History
Exyte GmbH - Original Registrant
Exyte AG - Owner At Publication

Classifications
9 Electronic apparatus and instruments for controlling, regulating and monitoring heating, air conditioning and ventilating installations for use in clean room installations; electronic control, regulating and monitoring apparatus and instruments, namely, thermostats, monitors and recording devices, measuring and control devices for pressure, temperature, consumption, and speed, all for control and monitoring of building and supply components, namely, air conditioners, clean rooms, clean air suppliers, and filter fan units; computers for monitoring and/or automating building control technology
11 Fans, filters for the industrial air purification, air filter ventilator units, lights, ventilating apparatus for air conditioning as well as air conditioning apparatus, all being for use in clean rooms, climatic chambers, clean room ceilings, rotation locks and tunnel locks; all the aforementioned goods fitted to the use in grid ceilings, walls, floors, covering plates and partitions; heating and air conditioning installations for building technology; refrigerating, heating, drying and ventilating installations, equipment and apparatus; air conditioning equipment and apparatus and installations consisting thereof; dust, solvent vapour and oil mist extraction and separating apparatus and installations, all being for use in clean room installations or for use in the treatment of atmospheric gases; fans for the aforementioned goods
37 Building construction supervision, assembly services relating to the installation and installation services in the field of building technology and process technology installations for air conditioning technology, clean room technology, building technology, electrical engineering, supply technology, sanitation technology, environmental control, computerization and media supply purposes; maintenance in the field of repair and cleaning of semi-conductor factories; construction of semi-conductor factories, assembly services relating to the installation and installation services relating to the building of semi-conductor factories; installation and assembly services relating to the installation of heating, refrigerating, air conditioning, drying, ventilating, extraction and separating installations and apparatus; implementation of maintenance and inspection works in the context of maintenance and inspection intervals stipulated by the manufacturer and repair and maintenance of heating, refrigerating, air conditioning, drying, ventilating, extraction and separating installations and apparatus; assembly services relating to the installation and installation of environmental protection apparatus and devices for existing factories
42 Technical planning of building technology and process technology installations for the air conditioning technology, clean room technology, building technology, electrical engineering, supply technology, sanitation technology, environmental control, computerization and media supply purposes; performance of technical inspections of statutory operability of heating, refrigerating, air conditioning, drying, ventilating, extraction and separating installations and apparatus; building technology services, namely, performance of technical inspections of operability of building technology installations and of technical production and process flow; technical planning and consultancy therefor relating to implementation of production process and flow in the field of microelectronics, the pharmaceutical industry and the food industry; technical planning and consultancy therefor relating to design and engineering of environmentally-friendly microelectronics; technological consultancy for the design and engineering of environmentally-friendly microelectronics; technical consultancy in the redesigning of semi-conductor factories; technical consultancy in the fields of energy measurement for improving ecological efficiency and energy saving and recycling technology; technical planning relating to the design and engineering of semi-conductor factories; technical planning, performance of technical inspection, as well as certification of clean rooms and all types of technical building equipment at the stages of planning, installation, function and performance, and of the documentation therefore in the context of technical project management and performance of technical inspections; technical planning relating to the design and engineering of building and process technology installations

Trademark Events
May 8, 2021
Change Of Name/Address Rec'd From Ib
Mar 13, 2020
Final Decision Transaction Processed By Ib
Feb 22, 2020
Final Disposition Notice Sent To Ib
Feb 21, 2020
Final Disposition Processed
Jan 29, 2020
Final Disposition Notice Created, To Be Sent To Ib
Oct 29, 2019
Registered-Principal Register
Aug 13, 2019
Published For Opposition
Aug 9, 2019
Notification Processed By Ib
Jul 24, 2019
Notification Of Possible Opposition Sent To Ib
Jul 24, 2019
Notice Of Start Of Opposition Period Created, To Be Sent To Ib
Jul 24, 2019
Notice Of Publication
Jul 11, 2019
Assigned To Lie
Jul 1, 2019
Approved For Pub - Principal Register
Jun 25, 2019
Teas/Email Correspondence Entered
Jun 24, 2019
Correspondence Received In Law Office
Jun 24, 2019
Teas Request For Reconsideration Received
Jun 11, 2019
Final Refusal Mailed
Jun 10, 2019
Final Refusal Written
Jun 5, 2019
Teas/Email Correspondence Entered
Jun 4, 2019
Correspondence Received In Law Office
Jun 4, 2019
Teas Response To Office Action Received
Apr 19, 2019
New Representative At Ib Received
Feb 1, 2019
New Representative At Ib Received
Jan 24, 2019
Change Of Name/Address Rec'd From Ib
Jan 5, 2019
Refusal Processed By Ib
Dec 4, 2018
Non-Final Action Mailed - Refusal Sent To Ib
Dec 4, 2018
Refusal Processed By Mpu
Nov 23, 2018
Application Filing Receipt Mailed
Nov 21, 2018
Non-Final Action (Ib Refusal) Prepared For Review
Nov 20, 2018
Non-Final Action Written
Nov 19, 2018
Assigned To Examiner
Nov 19, 2018
New Application Office Supplied Data Entered In Tram
Nov 15, 2018
Sn Assigned For Sect 66a Appl From Ib

Trademark Alertz updated from USPTO on 2030-01-24