Trademark: 79226560
Word
EMBR
Status
Dead
Status Code
602
Status Date
Wednesday, March 18, 2020
Serial Number
79226560
Mark Type
4000
Filing Date
Monday, November 27, 2017
Abandoned Date
Friday, March 6, 2020

Trademark Owner History
ABB AB - 1st New Owner Before Publication
ABB Power Grids Sweden AB - Original Applicant

Classifications
7 Brake linings other than for vehicles; brake segments other than for vehicles; brake shoes other than for vehicles; brake pads other than for vehicles; brakes for machines, namely, electromagnetic brakes for slab casters; machine tools, namely, electromagnetic brake tools for slab casters; injection moulding machines; magnetic conveyors; electric arc welding machines; electrical welding machines; electric welding apparatus, namely, electric welding machines, electric arc welders, robotic welding machines; electrical welding apparatus, namely, electric arc welders; metal welding machines electric
9 Data processing equipment, namely, data processors; computers; computer software for controlling and operating welding machines, moulding machines, electromagnetic brakes for billet, bloom and slab casters; electrical coils; thyristors; current converters; electric converters; measuring converters; computer hardware; industrial software for controlling and recording data from the operation of welding machines, moulding machines, electromagnetic brakes for slab casters; manufacturing software for reviewing, diagnostic, configuration and operation of industrial machinery, namely, welding machines, moulding machines, electromagnetic brakes for slab casters; electromechanical software for operating electromagnetic brakes; electromagnetic coils; electromagnetic electricity conduits for use in electrical installations; electromagnetic switches; electromagnetic relays; deflection yokes; deflecting yokes; magnetic detectors; magnetic coils; magnetic switches; magnetic cores; magnetic flux sensors; welding transformers; electrical and electronic components, namely, electric resistors, transistors, power switches, coding and decoding circuits, integrated circuits, displays, and signal panels
42 Industrial technological analysis services related to metallurgy, metal casting and electromagnetic brakes used in the field of metallurgy and metal casting; industrial research related to metallurgy, metal casting and electromagnetic brakes used in the field of metallurgy and metal casting; design and development of computer hardware; computer software design and development; metallurgical analysis; metallurgical testing, namely, testing of metal, material testing, for industrial purposes; research services related to metallurgy, metal casting and electromagnetic brakes used in the field of metallurgy and metal casting; metallurgical laboratory services for performing industrial process control and optimization; scientific and technological services related to metallurgy, metal casting and electromagnetic brakes used in the field of metallurgy and metal casting; product design and development related to metallurgy, metal casting and electromagnetic brakes used in the field of metallurgy and metal casting; software design and development; design and development of industrial products related to metallurgy, metal casting and electromagnetic brakes used in the field of metallurgy and metal casting

Trademark Events
May 14, 2021
Change Of Owner Received From Ib
Apr 4, 2021
Final Decision Transaction Processed By Ib
Mar 18, 2021
Final Disposition Notice Sent To Ib
Mar 18, 2021
Final Disposition Notice Created, To Be Sent To Ib
Feb 5, 2021
Change Of Name/Address Rec'd From Ib
Mar 18, 2020
Abandonment Notice E-Mailed - Failure To Respond
Mar 18, 2020
Abandonment - Failure To Respond Or Late Response
Feb 6, 2020
New Representative At Ib Received
Sep 5, 2019
Notification Of Final Refusal Emailed
Sep 5, 2019
Final Refusal E-Mailed
Sep 5, 2019
Final Refusal Written
Jul 26, 2019
Notification Of Possible Opposition - Processed By Ib
Jul 18, 2019
Teas/Email Correspondence Entered
Jul 18, 2019
Correspondence Received In Law Office
Jul 18, 2019
Teas Response To Office Action Received
Jul 10, 2019
Notification Of Possible Opposition Sent To Ib
Jul 10, 2019
Notification Of Possible Opposition Created, To Be Sent To Ib
Feb 6, 2019
Notification Of Non-Final Action E-Mailed
Feb 6, 2019
Non-Final Action E-Mailed
Feb 6, 2019
Non-Final Action Written
Jan 8, 2019
Teas Change Of Correspondence Received
Jan 8, 2019
Teas/Email Correspondence Entered
Jan 8, 2019
Correspondence Received In Law Office
Jan 8, 2019
Teas Response To Office Action Received
Jul 25, 2018
Non-Final Action Mailed
Jul 25, 2018
Non-Final Action Written
Jul 25, 2018
Data Modification Completed
Jul 2, 2018
Teas/Email Correspondence Entered
Jul 2, 2018
Correspondence Received In Law Office
Jun 28, 2018
Assigned To Lie
Jun 15, 2018
Teas Response To Office Action Received
Apr 6, 2018
Refusal Processed By Ib
Mar 21, 2018
Non-Final Action Mailed - Refusal Sent To Ib
Mar 21, 2018
Refusal Processed By Mpu
Mar 15, 2018
Non-Final Action (Ib Refusal) Prepared For Review
Mar 14, 2018
Non-Final Action Written
Mar 8, 2018
Assigned To Examiner
Feb 16, 2018
Application Filing Receipt Mailed
Feb 12, 2018
New Application Office Supplied Data Entered In Tram
Feb 8, 2018
Sn Assigned For Sect 66a Appl From Ib

Trademark Alertz updated from USPTO on 2030-01-24