Trademark: 79187348
Word
GLN MOLDING THE FUTURE
Status
Registered
Status Code
700
Status Date
Tuesday, June 26, 2018
Serial Number
79187348
Registration Number
5499749
Registration Date
Tuesday, June 26, 2018
Mark Type
3000
Filing Date
Friday, October 23, 2015
Published for Opposition
Tuesday, April 10, 2018

Trademark Owner History

Classifications
40 Custom manufacture of moulds for use in industry; engraving of moulds; contract moulding services, namely, custom manufacture of molds for use in industry; custom manufacture and assembly of moulds for others; Custom industrial moulding of textiles for others; moulding of implants for the human body for others; custom moulding of implant models for the human body for others; custom moulding of metals for others; custom moulding of furniture for others; processing of plastics; plastic injection moulding
7 Flat dies for use with industry machine tools; forging moulds for use in industry; injection moulding machines; injection plastic molding machines for moulding industrial plastic products; industrial injection moulding machines; industrial injection plastic molding machines; industrial moulds for die-casting metal products being parts of machines; industrial moulding tools, namely, moulding presses being machine parts for molds; machine tools, namely, industrial rotary dies; injection plastic moulding machines; moulding dies for use with machine tools; machines for the manufacturing moulds; parts of machines, namely, industrial injection presses, namely, injection plastic moulding machines; injection, stretch and blow moulding machines; parts of machines, namely, industrial injection moulding guns; parts of machines, namely, industrial die holders
42 Research, development and engineering in the field of production and construction of moulds; design and development of special tools for the moulds and plastics industry; engineering services in the fields of mould construction, plastics and die-cutting technology, injection moulding, investment casting and vacuum moulding, surface finishing and surface coating; technological planning and consulting services in the fields of plastic injection modeds and injection process; construction drafting for others in the field of mould construction, plastics, die-cutting technology, injection moulding, investment casting and vacuum moulding, surface finishing and surface coating; engineering services, particularly technical project planning and project preparation, namely, conception and design of new products and IT project management for others in the fields of mould construction, plastics and die-cutting technology, injection moulding, investment casting and vacuum moulding, surface finishing and surface coating; industrial testing of design concepts, molds approval and engineering injection process; quality control services for others in the fields of prototypes, patterns, models, moulds, tools and small-batch parts and mass-production parts; industrial design services; styling, namely, conception design of machines and injection moulds
The mark consists of the wording "GLN MOLDING THE FUTURE" and design; the wording "MOLDING" is stacked above the wording "THE FUTURE" and appears to the right of the term "GLN"; the wording "MOLDING THE FUTURE" is in gray and the term "GLM" is in black; the design element, which appears to the left of the term "GLN" consists of five diamonds, two triangles and two quadrilaterals which are all touching and create the appearance of a cube resting on one of its edges. The left diamond is red, the two adjacent diamonds to the right are orange, the two quadrilaterals and diamond to the right of the orange diamonds are yellow; the triangles between the two yellow quadrilaterals are white, and the diamond to the right of the two white triangles is dark magenta.
The color(s) dark magenta, red, orange, yellow, gray, black, and white is/are claimed as a feature of the mark.

Trademark Events
Jun 26, 2023
Courtesy Reminder - Sec. 71 (6-Yr) E-Mailed
Oct 19, 2018
Final Decision Transaction Processed By Ib
Sep 27, 2018
Final Disposition Notice Sent To Ib
Sep 27, 2018
Final Disposition Processed
Sep 26, 2018
Final Disposition Notice Created, To Be Sent To Ib
Jun 26, 2018
Registered-Principal Register
Apr 27, 2018
Notification Processed By Ib
Apr 10, 2018
Official Gazette Publication Confirmation E-Mailed
Apr 10, 2018
Published For Opposition
Mar 21, 2018
Notification Of Possible Opposition Sent To Ib
Mar 21, 2018
Notification Of Notice Of Publication E-Mailed
Mar 21, 2018
Notice Of Start Of Opposition Period Created, To Be Sent To Ib
Mar 6, 2018
Approved For Pub - Principal Register
Mar 6, 2018
Examiner's Amendment Entered
Mar 6, 2018
Notification Of Examiners Amendment E-Mailed
Mar 6, 2018
Examiners Amendment E-Mailed
Mar 6, 2018
Examiners Amendment -Written
Mar 6, 2018
Examiner's Amendment Entered
Mar 6, 2018
Notification Of Examiners Amendment E-Mailed
Mar 6, 2018
Examiners Amendment E-Mailed
Mar 6, 2018
Examiners Amendment -Written
Mar 5, 2018
Teas/Email Correspondence Entered
Mar 4, 2018
Correspondence Received In Law Office
Mar 4, 2018
Teas Response To Office Action Received
Nov 24, 2017
Notification Of Possible Opposition - Processed By Ib
Nov 8, 2017
Notification Of Possible Opposition Sent To Ib
Nov 8, 2017
Notification Of Possible Opposition Created, To Be Sent To Ib
Sep 5, 2017
Notification Of Non-Final Action E-Mailed
Sep 5, 2017
Non-Final Action E-Mailed
Sep 5, 2017
Non-Final Action Written
Aug 15, 2017
Teas/Email Correspondence Entered
Aug 15, 2017
Correspondence Received In Law Office
Aug 10, 2017
Teas Response To Office Action Received
Feb 10, 2017
Notification Of Non-Final Action E-Mailed
Feb 10, 2017
Non-Final Action E-Mailed
Feb 10, 2017
Non-Final Action Written
Jan 19, 2017
Teas/Email Correspondence Entered
Jan 19, 2017
Correspondence Received In Law Office
Jan 13, 2017
Assigned To Lie
Dec 15, 2016
Teas Response To Office Action Received
Jul 2, 2016
Refusal Processed By Ib
Jun 15, 2016
Non-Final Action Mailed - Refusal Sent To Ib
Jun 15, 2016
Refusal Processed By Mpu
Jun 15, 2016
Non-Final Action (Ib Refusal) Prepared For Review
Jun 14, 2016
Non-Final Action Written
Jun 14, 2016
Application Filing Receipt Mailed
Jun 8, 2016
Assigned To Examiner
Jun 8, 2016
New Application Office Supplied Data Entered
Jun 2, 2016
Sn Assigned For Sect 66a Appl From Ib

Trademark Alertz updated from USPTO on 2030-01-24