Trademark: 79187060
Word
VESTAS TURBINEPLUS
Status
Registered
Status Code
700
Status Date
Tuesday, May 22, 2018
Serial Number
79187060
Registration Number
5471831
Registration Date
Tuesday, May 22, 2018
Mark Type
4000
Filing Date
Wednesday, December 16, 2015
Published for Opposition
Tuesday, March 6, 2018

Trademark Owner History
Vestas Wind Systems A-S - Original Registrant

Classifications
7 Windmills, wind power plants, wind turbines, off-shore wind mills, off-shore wind power plants and off-shore wind turbines; parts and accessories for the aforesaid goods in the nature of products developed to upgrade and extend the lifetime of existing wind turbines, namely, mill towers and masts, blades, blade hubs, mill housings, bottom-mounted and floating mill foundations, rotation devices, yaw rings, drip trays, rain gutters and gears all specially adapted for windmills and wind turbines; devices specially adapted for wind turbines and windmills for setting the pitch of the blades, namely, devices for regulating the pitch of the wings or blades by shifting or turning the profile angle of each wing or blade in relation to the rotor blade defined by all the wings and blades; brakes and brake devices for windmills and wind turbines; main shafts for windmills and wind turbines; universal joints for windmills and wind turbines; transmissions for windmills and wind turbines; clutches for windmills and wind turbines and electric generators; cooling devices, namely, cooling radiators for motors and engines, and pumps for cooling engines and for cooling fans of motors and engines; helicopter landing pads for wind turbines in the nature of helidecks sold as an integral component of wind turbines; reserve power supply units in the nature of auxiliary power units for supplying electrical power; structural parts for all the aforesaid goods
9 Electrical, electronic and computer equipment for windmills, wind power plants, wind turbines and other wind-operated machines, in the nature of equipment developed to upgrade existing electrical, electronic and computer equipment for windmills, namely, electrical switches, electronic computers, and computer hardware; control and monitoring equipment, namely, electric control devices for automatically turning on or off the generator and for automatic starting after public power line breakdowns; surge protectors for overvoltage protection against strokes of lightning; microprocessor equipment for controlling and monitoring voltage, frequency, phase conditions, rotor speed, efficiency and thickness of brakes pads, temperature, wind direction and wind speed; vibration and oscillation sensors for installation in windmill housings; watt-hour meters; computer software for the operation, control and maintenance of wind turbines and software to enhance the performance of wind turbines; structural parts for all the aforesaid apparatus
35 Commercial advisory services relating to exploitation of wind energy and business advice on optimization and prolongation of energy production from wind turbines, on opportunities and solutions for extending the lifetime of wind turbines, and on optimizing the exploitation of wind turbines by upgrading wind turbine components and by enhanced control of the operation of wind turbines and by enhanced aerodynamic performances; commercial assistance in connection with optimizing energy production and yield from wind turbines and commercial assistance in connection with ensuring continued production and yield from wind turbines beyond expected life time
37 Repair, installation, maintenance and overhaul of machines and machine parts
42 Scientific and technological services, namely, scientific and technological research and analysis in the fields of wind energy, wind turbines and wind power plants and new product research and development all in the fields of wind energy, wind turbines and wind power plants and technical analysis, calculations and assessments of and for the improvement of the performance of wind energy and wind turbines; development of new products and of new engineering processes and concepts all aimed at improving the service, maintenance, repair and performance of wind turbines; technological advice and assistance in connection with implementing mechanical parts for wind turbines, implementing computer hardware and software for wind turbines and implementing engineering processes all for optimization and/or prolongation of energy production from wind turbines and third party certification, namely, testing, analysis, and evaluation of wind turbines to determine conformity with certification standards in order for operation beyond designed life time; consultancy and assistance in the field of quality control in connection with improving the monitoring, operation and control of windmills, wind turbines and wind power plants and other renewable energy power plants and quality control for others in the nature of remote monitoring, operation and control of windmills, wind turbines and wind power plants; technical data analysis services and technical inspection services in relation to windmills, wind power plants, wind turbines and other wind-operated machines and their parts and components for purposes of improved operation and production and for enabling operation beyond their design life time
VESTAS TURBINE PLUS

Trademark Events
Sep 28, 2018
Final Decision Transaction Processed By Ib
Sep 8, 2018
Final Disposition Notice Sent To Ib
Sep 8, 2018
Final Disposition Processed
Aug 22, 2018
Final Disposition Notice Created, To Be Sent To Ib
May 22, 2018
Registered-Principal Register
Mar 9, 2018
Notification Processed By Ib
Mar 6, 2018
Official Gazette Publication Confirmation E-Mailed
Mar 6, 2018
Published For Opposition
Feb 14, 2018
Notification Of Possible Opposition Sent To Ib
Feb 14, 2018
Notification Of Notice Of Publication E-Mailed
Feb 14, 2018
Notice Of Start Of Opposition Period Created, To Be Sent To Ib
Jan 25, 2018
Approved For Pub - Principal Register
Jan 23, 2018
Examiner's Amendment Entered
Jan 23, 2018
Notification Of Examiners Amendment E-Mailed
Jan 23, 2018
Examiners Amendment E-Mailed
Jan 23, 2018
Examiners Amendment -Written
Nov 17, 2017
Notification Of Possible Opposition - Processed By Ib
Nov 1, 2017
Notification Of Possible Opposition Sent To Ib
Nov 1, 2017
Notification Of Possible Opposition Created, To Be Sent To Ib
Sep 8, 2017
New Representative At Ib Received
Jun 16, 2017
New Representative At Ib Received
May 11, 2017
New Representative At Ib Received
Feb 24, 2017
Notification Processed By Ib
Feb 10, 2017
Assigned To Examiner
Feb 10, 2017
Previous Allowance Count Withdrawn
Feb 10, 2017
Assigned To Examiner
Feb 10, 2017
Withdrawn From Issue - Senior Attorney Request
Feb 9, 2017
New Representative At Ib Received
Jan 24, 2017
Assigned To Examiner
Jan 17, 2017
Official Gazette Publication Confirmation E-Mailed
Jan 17, 2017
Published For Opposition
Jan 11, 2017
Notification Of Possible Opposition Sent To Ib
Jan 11, 2017
Notice Of Start Of Opposition Period Created, To Be Sent To Ib
Dec 28, 2016
Notification Of Notice Of Publication E-Mailed
Dec 15, 2016
Approved For Pub - Principal Register
Dec 1, 2016
Teas Change Of Correspondence Received
Dec 1, 2016
Teas/Email Correspondence Entered
Dec 1, 2016
Correspondence Received In Law Office
Dec 1, 2016
Teas Response To Office Action Received
Jun 17, 2016
Refusal Processed By Ib
Jun 2, 2016
Non-Final Action Mailed - Refusal Sent To Ib
Jun 2, 2016
Refusal Processed By Mpu
Jun 2, 2016
Non-Final Action (Ib Refusal) Prepared For Review
Jun 1, 2016
Non-Final Action Written
May 31, 2016
Application Filing Receipt Mailed
May 27, 2016
Assigned To Examiner
May 27, 2016
New Application Office Supplied Data Entered In Tram
May 26, 2016
Sn Assigned For Sect 66a Appl From Ib

Trademark Alertz updated from USPTO on 2030-01-24