Trademark: 79126343
Word
LVT
Status
Registered
Status Code
706
Status Date
Friday, July 24, 2020
Serial Number
79126343
Registration Number
4535201
Registration Date
Tuesday, May 27, 2014
Mark Type
4000
Filing Date
Friday, December 7, 2012
Published for Opposition
Tuesday, March 11, 2014

Trademark Owner History
Sonneville AG - Original Registrant

Classifications
19 Non-metallic building materials, namely, concrete blocks, concrete blocks incorporating a rail fastening system and railway supports; rigid pipes, not of metal, for building; asphalt, pitch and bitumen; transportable buildings, not of metal; monuments, not of metal, concrete building elements, namely, concrete blocks, concrete blocks incorporating a rail fastening system and railway supports, non-metal shuttering for concrete, namely, casting forms, railway sleepers of wood, gravel, cement, sand excluding foundry sand, and concrete
17 Rubber, gutta-percha, pure gum rubber sheets, asbestos, mica and goods made from these materials, namely, boots and pads for insulating, reducing vibration and noise reduction in railway supports; goods made of semi processed plastics, namely, for insulating, reducing vibration and noise reduction in railway supports; packing and insulating materials, and stopping materials, namely, boots and pads for insulating, reducing vibration and noise reduction in railway supports; flexible pipes, not of metal; rubber parts for railway sleepers, namely, boots and pads for insulating, reducing vibration and noise reduction in railway supports; sock-type elements of rubber, namely, boots for insulating, reducing vibration and noise reduction in railway supports
42 Scientific and technological services, namely, research, analysis, testing, evaluation, design, and engineering design services in the field of railway track systems, slab track systems and railway support systems; mechanical research and design of land vehicles; industrial analysis and research in the field of railway track systems, slab track systems and railway support systems; design and development of computers and software; industrial design; engineering; surveying; technical research in the field of railway track systems, slab track systems, and railway support systems; construction drafting; testing of materials; quality control for others; technical project study, namely, technical research in the field of railway track systems, slab track systems and railway support systems

Trademark Events
Apr 2, 2024
Teas Section 71 Received
May 27, 2023
Courtesy Reminder - Sec. 71 (10-Yr) E-Mailed
Dec 23, 2022
International Registration Renewed
Jul 24, 2020
Notice Of Acceptance Of Sec. 71 - E-Mailed
Jul 24, 2020
Registered-Sec.71 Accepted
Jul 21, 2020
Case Assigned To Post Registration Paralegal
May 15, 2020
Teas Section 71 Received
May 27, 2019
Courtesy Reminder - Sec. 71 (6-Yr) E-Mailed
Mar 23, 2018
New Representative At Ib Received
Nov 14, 2014
Final Decision Transaction Processed By Ib
Oct 9, 2014
Final Disposition Notice Sent To Ib
Oct 9, 2014
Final Disposition Processed
Aug 27, 2014
Final Disposition Notice Created, To Be Sent To Ib
May 27, 2014
Registered-Principal Register
Mar 11, 2014
Official Gazette Publication Confirmation E-Mailed
Mar 11, 2014
Published For Opposition
Mar 6, 2014
Notification Processed By Ib
Feb 19, 2014
Notification Of Possible Opposition Sent To Ib
Feb 19, 2014
Notice Of Start Of Opposition Period Created, To Be Sent To Ib
Feb 19, 2014
Notification Of Notice Of Publication E-Mailed
Feb 3, 2014
Law Office Publication Review Completed
Feb 3, 2014
Assigned To Lie
Jan 30, 2014
Approved For Pub - Principal Register
Jan 14, 2014
Examiner's Amendment Entered
Jan 14, 2014
Assigned To Lie
Jan 14, 2014
Notification Of Examiners Amendment E-Mailed
Jan 14, 2014
Examiners Amendment E-Mailed
Jan 14, 2014
Examiners Amendment -Written
Oct 16, 2013
Notification Of Final Refusal Emailed
Oct 16, 2013
Final Refusal E-Mailed
Oct 16, 2013
Final Refusal Written
Sep 26, 2013
Teas/Email Correspondence Entered
Sep 26, 2013
Correspondence Received In Law Office
Sep 26, 2013
Teas Response To Office Action Received
Apr 29, 2013
Refusal Processed By Ib
Apr 5, 2013
Non-Final Action Mailed - Refusal Sent To Ib
Apr 5, 2013
Refusal Processed By Mpu
Apr 3, 2013
Non-Final Action (Ib Refusal) Prepared For Review
Apr 2, 2013
Non-Final Action Written
Mar 26, 2013
Assigned To Examiner
Mar 15, 2013
Application Filing Receipt Mailed
Mar 11, 2013
New Application Office Supplied Data Entered
Mar 7, 2013
Sn Assigned For Sect 66a Appl From Ib

Trademark Alertz updated from USPTO on 2030-01-24