Trademark: 79113663
Word
G GREEN ENGINEERING
Status
Dead
Status Code
404
Status Date
Monday, April 11, 2022
Serial Number
79113663
Registration Number
4402110
Registration Date
Tuesday, September 17, 2013
Mark Type
5000
Filing Date
Tuesday, April 10, 2012
Published for Opposition
Tuesday, July 2, 2013
Cancellation Date
Monday, April 11, 2022

Trademark Owner History

Classifications
9 Apparatuses and instruments for switching, regulating and controlling of electricity, namely, electric converters, electrical controllers, electric and electronic switches, electric and electronic closed loop and open loop control apparatus to be used to control catalytic converters; electric devices for the measuring- and regulating technique, namely, clamp meters for measuring electricity; devices for recording, transmitting and displaying of data, namely, computers; measuring- and monitoring devices, namely, electronic monitors and monitor modules for monitoring electric current and electrical signals; armatures for use in electrical apparatus as parts of the devices for the measuring- and regulating technique; flow-measuring and flow-regulating devices, namely, flow meters, automatic liquid-flow control machines and instruments, sensors and transmitters for measuring, switching and proportioning liquid and gaseous media, namely, mass flow rate meters and flow regulators for commercial use as well as electronic pressure regulators for high pressure gases and liquids, except for regulators for gas, water or other sanitary installations; flow-sensors, namely, pressure sensors, fluid control sensors and level regulators, combinations of the aforesaid goods to form systems; pressure measuring devices and pressure regulating devices for hydraulic and pneumatic installations and electromagnetically actuated pilot valves, namely, pressure sensors, pressure meters, pressure regulators; scientific laboratory devices for the clinical field, namely, apparatus and instruments for the measurement and control of fluids, namely, flow meters; filters as parts of analysis-devices for laboratory purposes; electrical controlling devices for medical devices and instruments; electronic components, namely, integrated circuits chips for use in measuring the flow, pressure, filling level and/or temperature in regulators, control elements, valves and sensors; electronic components, namely, computer chips for use in the field of the drive-, control- and regulating-technique, including field bus technique and industrial communication
7 Valves, clack valves and faucets of plastic or metal as a machine component for hydraulic and pneumatic machines; electric, pneumatic and hydraulic drives for valves, namely, pneumatically or hydraulically actuated cylinders, as a machine part
35 Business organization and business administration consultation, in the field of environment protection, regenerative energy, energy conservation, climate change, waste prevention and sustainable development; procuring of contracts for the purchase and sale of goods; providing an on-line computer database in the field of business information and business contacts; business organization and administration relating to business contacts, in the field of environment protection, regenerative energy, waste prevention and sustainable development, with such service provided online
42 Scientific and technological services, namely, product research and design of new products in the field of energy conservation, regenerative energy; industrial research in the field of energy conservation; scientific research in the field of the environment protection; technical consultation in relation to research services in the fields of environment protection and energy efficiency conservation; scientific research and technical writing of technical and scientific documents for others; scientific research in the field of the sustainable use of nature and environment; scientific research, especially referring to environment protection, regenerative energy, energy conservation, climate change, waste prevention and sustainable development
The mark consists of a large stylized letter "G" with the stacked words "green engineering" below.
Color is not claimed as a feature of the mark.
"GREEN ENGINEERING"

Trademark Events
Oct 30, 2022
Notification Of Effect Of Cancellation Of Intl Reg E-Mailed
Oct 30, 2022
Death Of International Registration
Jan 15, 2022
Total Invalidation Processed By The Ib
Dec 22, 2021
Generic Madrid Transaction Sent To Ib
Dec 22, 2021
Generic Madrid Transaction Created
Nov 27, 2021
New Representative At Ib Received
Oct 26, 2021
Total Invalidation Of Reg Ext Protection Created
Feb 26, 2021
Cancelled Section 71
Feb 12, 2021
New Representative At Ib Received
Sep 17, 2018
Courtesy Reminder - Sec. 71 (6-Yr) E-Mailed
Jul 30, 2015
New Representative At Ib Received
May 22, 2015
New Representative At Ib Received
Mar 20, 2014
New Representative At Ib Received
Feb 21, 2014
Final Decision Transaction Processed By Ib
Feb 4, 2014
Final Disposition Notice Sent To Ib
Feb 4, 2014
Final Disposition Processed
Dec 17, 2013
Final Disposition Notice Created, To Be Sent To Ib
Sep 17, 2013
Registered-Principal Register
Jul 21, 2013
Notification Processed By Ib
Jul 2, 2013
Official Gazette Publication Confirmation E-Mailed
Jul 2, 2013
Published For Opposition
Jun 19, 2013
Notification Of Possible Opposition Sent To Ib
Jun 19, 2013
Notice Of Start Of Opposition Period Created, To Be Sent To Ib
Jun 12, 2013
Notification Of Notice Of Publication E-Mailed
May 29, 2013
Law Office Publication Review Completed
May 29, 2013
Assigned To Lie
May 15, 2013
Approved For Pub - Principal Register
May 11, 2013
Teas/Email Correspondence Entered
May 10, 2013
Correspondence Received In Law Office
May 10, 2013
Teas Response To Office Action Received
Dec 31, 2012
Notification Of Non-Final Action E-Mailed
Dec 31, 2012
Non-Final Action E-Mailed
Dec 31, 2012
Non-Final Action Written
Dec 5, 2012
Teas/Email Correspondence Entered
Dec 4, 2012
Correspondence Received In Law Office
Dec 4, 2012
Teas Response To Office Action Received
Aug 29, 2012
Refusal Processed By Ib
Aug 6, 2012
Non-Final Action Mailed - Refusal Sent To Ib
Aug 6, 2012
Refusal Processed By Mpu
Aug 4, 2012
Non-Final Action (Ib Refusal) Prepared For Review
Aug 3, 2012
Non-Final Action Written
Jul 24, 2012
Assigned To Examiner
Jul 4, 2012
Application Filing Receipt Mailed
Jun 30, 2012
New Application Office Supplied Data Entered In Tram
Jun 28, 2012
Sn Assigned For Sect 66a Appl From Ib

Trademark Alertz updated from USPTO on 2030-01-24