Trademark: 79101002
Word
UHLIG ROHRBOGEN
Status
Dead
Status Code
404
Status Date
Friday, February 5, 2021
Serial Number
79101002
Registration Number
4219915
Registration Date
Tuesday, October 9, 2012
Mark Type
3000
Filing Date
Friday, February 4, 2011
Published for Opposition
Tuesday, July 24, 2012
Cancellation Date
Friday, February 5, 2021

Trademark Owner History
Uhlig Rohrleitungskomponenten GmbH - Original Registrant
Uhlig Rohrbogen GmbH - Owner At Publication

Classifications
6 Common metals and their alloys including stainless steel; Common metals, unwrought and semi-worked, for further manufacture; Metal building materials, namely, metal elbow pipes, metal t-shaped pipes, metal y-shaped pipes, metal corrugated pipes, metal shell rings, semi-elliptical heads and extrusions made of metal, metal cladding for construction and building, and metal components, namely, reducers and pipe supports; Transportable buildings of metal; Materials of metal for railway construction; Non-electric cables and wires of common metal; Ironmongery in the nature of small items of metal hardware, namely, nails, screws, washers, springs, pulleys, brackets, hooks, nuts, and bolts; Pipes and tubes of metal, namely, corrugated pipes, bent tubes, and T-fittings; Metal pipe connectors and supports; Metal storage tanks and roofs therefor; Metal roofing; General purpose metal storage containers; Metal jalousies; Metal plates, namely, corrosion-resistant metal overlays and alloys for fittings, steel plates, flanges, and piping components; Metal posts; parts and fittings for the foregoing goods
11 Heating installations; Heating units for industrial purposes; Steam generators; Steam generating installations; Refrigerators; Refrigerating machines and installations; Drying apparatus for use in heating, ventilation systems, air conditioning systems, and refrigeration systems; Air-conditioning, air cooling, and ventilation apparatus and instruments; Water heaters; Water purification installations; Water softening apparatus and installations; Water filtering apparatus; Heat exchangers not being parts of machines, namely, plate heat exchangers; Heat pumps; Heat generators; Heat accumulators; parts and fittings for the foregoing goods
37 Building construction; Installation of pipelines and pipeline components; Installation of heating, ventilating, and air conditioning equipment; Maintenance and repair of milling machines, drilling machines, and welding machines; Rental of construction machines, namely, milling machines, drilling machines, and welding machines; Maintenance, cleaning, and repair of heating and boiler installations, namely, steam boilers; Installation, maintenance, and repair of pipelines, pipes and parts of pipes, namely, for industrial plants, chemical and petrochemical plants, power plants, shipbuilding, in heating installations, and in compressor stations
40 Treatment of materials, namely, welding, hardening, plating, and coating of pipes; Metal processing and refinement, namely, surface treatment in the nature of metal treatment; Metal casting; Rental of machines for use in metalworking and manufacturing, namely, milling machines, drilling machines, and welding machines
42 Scientific and technological services, namely, research and design in the field of metal processing; Industrial research and analysis in the field of metal machining; Construction drafting; Technical consulting concerning the design of pipes and pipe systems, for milling, drilling, and welding works, for tool and mold engineering, in mechanical engineering, and in vehicle and aircraft engineering; Surveying in the field of metal machining
Color is not claimed as a feature of the mark.
"ROHRBOGEN"
The mark consists of the wording "UHLIG ROHRBOGEN" in stylized script with a design between the words. The design features two short bands that curve into each other.
The English translation of "Rohrbogen" in the mark is "pipeline curve".

Trademark Events
Aug 21, 2021
Notification Of Effect Of Cancellation Of Intl Reg E-Mailed
Aug 21, 2021
Death Of International Registration
Feb 13, 2021
Total Invalidation Processed By The Ib
Jan 12, 2021
Total Invalidation Of Reg Ext Protection Sent To Ib
Jan 12, 2021
Invalidation Processed
Jan 5, 2021
Total Invalidation Of Reg Ext Protection Created
Jun 4, 2020
Change Of Name/Address Rec'd From Ib
May 6, 2020
Notice Of Cancellation Sec. 71 E-Mailed
May 5, 2020
Cancelled Section 71
Oct 23, 2019
Post Registration Action Mailed - Sec. 71 & 15
Apr 24, 2019
Case Assigned To Post Registration Paralegal
Apr 5, 2019
Teas Section 71 & 15 Received
Oct 9, 2017
Courtesy Reminder - Sec. 71 (6-Yr) E-Mailed
Sep 18, 2015
New Representative At Ib Received
Jun 18, 2013
Final Decision Transaction Processed By Ib
May 30, 2013
Final Disposition Notice Sent To Ib
May 30, 2013
Final Disposition Processed
Jan 9, 2013
Final Disposition Notice Created, To Be Sent To Ib
Oct 9, 2012
Registered-Principal Register
Aug 29, 2012
Notification Processed By Ib
Jul 24, 2012
Official Gazette Publication Confirmation E-Mailed
Jul 24, 2012
Published For Opposition
Jul 4, 2012
Notification Of Possible Opposition Sent To Ib
Jul 4, 2012
Notice Of Start Of Opposition Period Created, To Be Sent To Ib
Jul 4, 2012
Notification Of Notice Of Publication E-Mailed
Jun 20, 2012
Law Office Publication Review Completed
Jun 14, 2012
Approved For Pub - Principal Register
Jun 14, 2012
Examiner's Amendment Entered
Jun 14, 2012
Notification Of Examiners Amendment E-Mailed
Jun 14, 2012
Examiners Amendment E-Mailed
Jun 14, 2012
Examiners Amendment -Written
Jun 6, 2012
Teas/Email Correspondence Entered
Jun 6, 2012
Correspondence Received In Law Office
Jun 6, 2012
Teas Response To Office Action Received
Feb 20, 2012
Notification Of Non-Final Action E-Mailed
Feb 20, 2012
Non-Final Action E-Mailed
Feb 20, 2012
Non-Final Action Written
Feb 9, 2012
Teas/Email Correspondence Entered
Feb 9, 2012
Correspondence Received In Law Office
Jan 30, 2012
Assigned To Lie
Jan 18, 2012
Attorney/Dom.Rep.Revoked And/Or Appointed
Jan 18, 2012
Teas Revoke/App/Change Addr Of Atty/Dom Rep Received
Jan 18, 2012
Teas Response To Office Action Received
Sep 24, 2011
Refusal Processed By Ib
Sep 7, 2011
Non-Final Action Mailed - Refusal Sent To Ib
Sep 7, 2011
Refusal Processed By Mpu
Sep 7, 2011
Non-Final Action (Ib Refusal) Prepared For Review
Sep 6, 2011
Non-Final Action Written
Aug 30, 2011
Application Filing Receipt Mailed
Aug 26, 2011
Assigned To Examiner
Aug 26, 2011
New Application Office Supplied Data Entered In Tram
Aug 25, 2011
Sn Assigned For Sect 66a Appl From Ib

Trademark Alertz updated from USPTO on 2030-01-24