Trademark: 79100977
Word
MAGEBA
Status
Registered
Status Code
706
Status Date
Thursday, November 9, 2023
Serial Number
79100977
Registration Number
4212034
Registration Date
Tuesday, September 25, 2012
Mark Type
4000
Filing Date
Wednesday, June 1, 2011
Published for Opposition
Tuesday, July 10, 2012

Trademark Owner History

Classifications
9 Surveying, measuring, signalling, checking and monitoring apparatus and instruments, namely, force sensors, strain and tilt sensors, movement sensors, acceleration sensors, vibration sensors, structural temperature sensors and GPS position monitoring and meteorological surveillance instruments; devices and apparatus for monitoring, remote monitoring of physical entities and conditions of bearings, expansion joints, other construction elements and building structures, namely, force sensors, strain and tilt sensors, movement sensors, acceleration sensors, vibration sensors, structural temperature sensors and GPS position monitoring and meteorological surveillance instruments
19 Bearings for construction not of metal, namely, slide bearings for accommodating relative movement of buildings and bridges, non-metal anti-vibration bearing mountings for construction for application in bridges or other types of edifices, primarily made of non-metallic material; Non-metal expansion joints for floors and walls for construction, namely, for application in bridges or other types of edifices, primarily made of non-metallic material
6 Metal bearings for construction, namely, pot, elastomeric, spherical, linear rocker, incremental launch, horizontal force, stroke-measuring, earthquake and guide bearings, metal support seismic isolation bearings used in construction for protection of structures against damage by nature and other causes, structural parts and members for all such bearings, namely, metal shock absorbers, metal shock transmission units, preloaded metal spring and spring disc dampers, lead rubber bearings and pendulum isolators for application in bridges or other types of edifices, primarily made of metal; expansion joint structures for construction, namely, single gap joints, modular expansion joints, cantilever and sliding finger joints, mat joints and railway expansion joints for installation into asphalt, concrete, plastic and steel for application in bridges or other types of edifices, primarily made of metal; structural component and replacement parts of such bearings and expansion, namely, sealing alloys, metal elastomeric pads, metal bearing pots, metal bearing shells, metal sliding plates, metal anchors, metal profiles, bars and cover plates
37 Building construction work; repair and maintenance services of bridges and buildings
42 Civil engineering services; technological services, namely, structural engineering services, structural inspection services, planning of infrastructure systems relating to construction of bridges, other edifices and other building structures; consultancy services in the field of bridge technology; engineering design of structural parts of bridges and other edifices
Color is not claimed as a feature of the mark.

Trademark Events
Nov 9, 2023
Notice Of Acceptance Of Sec. 71 - E-Mailed
Nov 9, 2023
Registered-Sec.71 Accepted
Nov 7, 2023
Case Assigned To Post Registration Paralegal
Mar 23, 2023
Teas Section 71 Received
Mar 18, 2022
Change Of Owner Received From Ib
Sep 25, 2021
Courtesy Reminder - Sec. 71 (10-Yr) E-Mailed
Jul 16, 2021
International Registration Renewed
Sep 29, 2018
Notice Of Acceptance Of Sec. 71 & 15 - E-Mailed
Sep 29, 2018
Registered - Sec. 71 Accepted & Sec. 15 Ack.
Sep 27, 2018
Case Assigned To Post Registration Paralegal
Sep 24, 2018
Teas Section 71 & 15 Received
Sep 21, 2018
Attorney/Dom.Rep.Revoked And/Or Appointed
Sep 21, 2018
Teas Revoke/App/Change Addr Of Atty/Dom Rep Received
Sep 14, 2018
Withdrawal Of Attorney Granted
Sep 14, 2018
Teas Withdrawal Of Attorney Received
Sep 25, 2017
Courtesy Reminder - Sec. 71 (6-Yr) E-Mailed
May 4, 2017
New Representative At Ib Received
Jan 14, 2013
Final Decision Transaction Processed By Ib
Dec 26, 2012
Final Disposition Notice Sent To Ib
Dec 26, 2012
Final Disposition Processed
Dec 25, 2012
Final Disposition Notice Created, To Be Sent To Ib
Sep 25, 2012
Registered-Principal Register
Sep 22, 2012
Notification Processed By Ib
Jul 10, 2012
Official Gazette Publication Confirmation E-Mailed
Jul 10, 2012
Published For Opposition
Jun 20, 2012
Notification Of Possible Opposition Sent To Ib
Jun 20, 2012
Notice Of Start Of Opposition Period Created, To Be Sent To Ib
Jun 20, 2012
Notification Of Notice Of Publication E-Mailed
Jun 2, 2012
Law Office Publication Review Completed
May 31, 2012
Approved For Pub - Principal Register
May 31, 2012
Examiner's Amendment Entered
May 31, 2012
Notification Of Examiners Amendment E-Mailed
May 31, 2012
Examiners Amendment E-Mailed
May 31, 2012
Examiners Amendment -Written
May 24, 2012
Teas/Email Correspondence Entered
May 24, 2012
Correspondence Received In Law Office
May 24, 2012
Teas Request For Reconsideration Received
Mar 22, 2012
Notification Of Final Refusal Emailed
Mar 22, 2012
Final Refusal E-Mailed
Mar 22, 2012
Final Refusal Written
Mar 1, 2012
Teas/Email Correspondence Entered
Mar 1, 2012
Correspondence Received In Law Office
Mar 1, 2012
Applicant/Correspondence Changes (Non-Responsive) Entered
Feb 9, 2012
Assigned To Lie
Feb 2, 2012
Teas Response To Office Action Received
Oct 9, 2011
Refusal Processed By Ib
Sep 20, 2011
Non-Final Action Mailed - Refusal Sent To Ib
Sep 20, 2011
Refusal Processed By Mpu
Sep 19, 2011
Non-Final Action (Ib Refusal) Prepared For Review
Sep 18, 2011
Non-Final Action Written
Sep 17, 2011
Assigned To Examiner
Aug 30, 2011
Application Filing Receipt Mailed
Aug 26, 2011
New Application Office Supplied Data Entered
Aug 25, 2011
Sn Assigned For Sect 66a Appl From Ib

Trademark Alertz updated from USPTO on 2030-01-24