Trademark: 79091684
Word
MAXSINE
Status
Dead
Status Code
404
Status Date
Friday, October 30, 2020
Serial Number
79091684
Registration Number
4277656
Registration Date
Tuesday, January 22, 2013
Mark Type
4000
Filing Date
Friday, October 29, 2010
Published for Opposition
Tuesday, November 6, 2012
Cancellation Date
Friday, October 30, 2020

Trademark Owner History
Grid Solutions SAS - Original Registrant
ALSTOM Grid SAS - Owner At Publication

Classifications
9 Electrical switchgear in the nature of voltage and/or current controllers for electric power lines; electric power converters using power semi-conductors for conducting, transporting, distributing, switching, accumulating, regulating, checking or controlling electric power; apparatus, namely, voltage and/or current regulators for electric power used for checking, controlling and regulating electric power converters; supervision and control apparatus, namely, protective electric relays, electrical unit controllers, electric meters, electrical transducers and intelligent devices in the nature of smart electrical controllers, linked by a fiber-optic network and computer software used to integrate protect, control, monitor, and manage communication architecture for electric power; computers, computer software and recorded computer programs used to check, control and regulate electric converters and used for programming, implementing and operating the aforementioned apparatus, instruments, installations and software; computer software for providing access to a computer network or a data transmission network for checking, controlling and regulating electric power converters; computer software for providing access to computer network or data transmission network for checking, controlling and regulating electrical and electronic apparatus and instruments which use power semi-conductors for conducting, transporting, distributing, switching, accumulating, regulating, checking or controlling electric power; electric power converters comprised of pre-assembled units containing voltage and current generators; switchgear cubicles, namely, cubicles composed primarily of electric batteries, and cooling equipment in the nature of air ventilators for electronic components or water cooled heat sinks for use in electronic components and switchgear controlling and protecting electronic apparatus and instruments in the nature of electrical switchgear and switchboards used with electric power converters; filters, namely, harmonic filters for electrical networks and converters using capacitors and inductors. high and medium tension electrical apparatus and instruments, namely, circuit breakers, electrical switch disconnectors, lightning conductors, voltage dividers and power transformers for conversion substations for transporting, distributing and supplying and converting electric power
37 Construction of conversion substations for transporting, distributing and converting electric power; installation and activation of conversion substations for transporting, distributing and converting electric power; renovation and repair of conversion substations for transporting, distributing and converting electric power; maintenance of conversion substations for transporting, distributing and converting electric power; major building work, namely, excavation services, building construction services, drain and sewer cleaning and rootering services, road construction, earth work construction services, building construction, sewer work in the nature of sewer cleaning and rootering services; finishing work, namely, installation of electrical and lighting systems, installation of heating, ventilation, and air conditioning systems and painting services as part of the construction of conversion substations for transporting, distributing and converting electric power
42 Technical research, design and development of converters using power semi-conductors for conducting, transporting, distributing, switching, accumulating, regulating, checking or controlling electric power; technical research design and development of apparatus for checking and controlling electric power converters using electrical protection, communication, measuring and counting, supervision and control apparatus linked by a fiber-optic network as well as computer software intended to integrate protection, control, monitoring, management and communication architecture for electric power; technical research and design of switchgear cubicles and switchboards, electric batteries and cooling equipment intended for electric power converters; technical research and design of filters for electric power converters using capacitors and inductors; technical research and design of high and medium tension electrical apparatus comprising circuit breakers, disconnectors, lightning conductors, voltage dividers and power transformers; technical research and design of substations for transporting, distributing and converting electric power, technical research and planning of major building work and finishing work for conversion substations for transporting, distributing and converting electric power; maintenance, programming, development and updating of computer software for running electric power conversion substations
Color is not claimed as a feature of the mark.
MAX SINE
The wording "MAXSINE" has no meaning in a foreign language.

Trademark Events
May 16, 2021
Notification Of Effect Of Cancellation Of Intl Reg E-Mailed
May 16, 2021
Death Of International Registration
Jul 3, 2020
Total Invalidation Processed By The Ib
Jun 4, 2020
Total Invalidation Of Reg Ext Protection Sent To Ib
Jun 4, 2020
Invalidation Processed
Apr 23, 2020
Total Invalidation Of Reg Ext Protection Created
Aug 23, 2019
Cancelled Section 71
Dec 20, 2018
New Representative At Ib Received
Nov 27, 2018
Attorney/Dom.Rep.Revoked And/Or Appointed
Nov 27, 2018
Teas Revoke/App/Change Addr Of Atty/Dom Rep Received
Jan 22, 2018
Courtesy Reminder - Sec. 71 (6-Yr) E-Mailed
Aug 31, 2017
New Representative At Ib Received
May 23, 2017
Attorney/Dom.Rep.Revoked And/Or Appointed
May 23, 2017
Teas Revoke/App/Change Addr Of Atty/Dom Rep Received
Feb 16, 2017
Change Of Name/Address Rec'd From Ib
Dec 30, 2016
New Representative At Ib Received
Jul 11, 2014
New Representative At Ib Received
Jul 3, 2014
Attorney/Dom.Rep.Revoked And/Or Appointed
Jul 3, 2014
Teas Revoke/App/Change Addr Of Atty/Dom Rep Received
May 25, 2013
Final Decision Transaction Processed By Ib
Apr 23, 2013
Final Disposition Notice Sent To Ib
Apr 23, 2013
Final Disposition Processed
Apr 22, 2013
Final Disposition Notice Created, To Be Sent To Ib
Jan 22, 2013
Registered-Principal Register
Dec 14, 2012
Notification Processed By Ib
Nov 6, 2012
Official Gazette Publication Confirmation E-Mailed
Nov 6, 2012
Published For Opposition
Oct 17, 2012
Notification Of Possible Opposition Sent To Ib
Oct 17, 2012
Notice Of Start Of Opposition Period Created, To Be Sent To Ib
Oct 17, 2012
Notification Of Notice Of Publication E-Mailed
Sep 28, 2012
Law Office Publication Review Completed
Sep 18, 2012
Assigned To Lie
Sep 11, 2012
Approved For Pub - Principal Register
Sep 11, 2012
Examiner's Amendment Entered
Sep 11, 2012
Notification Of Examiners Amendment E-Mailed
Sep 11, 2012
Examiners Amendment E-Mailed
Sep 11, 2012
Examiners Amendment -Written
Sep 5, 2012
Notification For Req For Recon Denied No Appeal Filed
Sep 5, 2012
Action For Req For Recon Denied No Appeal Filed E-Mailed
Sep 5, 2012
Action Req For Recon Denied No Appeal Filed Counted Not Mailed
Aug 20, 2012
Teas/Email Correspondence Entered
Aug 20, 2012
Correspondence Received In Law Office
Aug 20, 2012
Teas Request For Reconsideration Received
Jul 6, 2012
Notification Of Possible Opposition - Processed By Ib
Jun 20, 2012
Notification Of Possible Opposition Sent To Ib
Jun 20, 2012
Notification Of Possible Opposition Created, To Be Sent To Ib
Mar 21, 2012
Notification Of Final Refusal Emailed
Mar 21, 2012
Final Refusal E-Mailed
Mar 21, 2012
Final Refusal Written
Mar 2, 2012
Teas/Email Correspondence Entered
Mar 2, 2012
Correspondence Received In Law Office
Feb 25, 2012
Assigned To Lie
Feb 23, 2012
Teas Response To Office Action Received
Dec 17, 2011
Change Of Name/Address Rec'd From Ib
Sep 15, 2011
Notification Of Non-Final Action E-Mailed
Sep 15, 2011
Non-Final Action E-Mailed
Sep 15, 2011
Non-Final Action Written
Aug 25, 2011
Teas/Email Correspondence Entered
Aug 25, 2011
Correspondence Received In Law Office
Aug 24, 2011
Assigned To Lie
Aug 16, 2011
Teas Response To Office Action Received
Mar 12, 2011
Refusal Processed By Ib
Feb 18, 2011
Non-Final Action Mailed - Refusal Sent To Ib
Feb 18, 2011
Refusal Processed By Mpu
Feb 17, 2011
Non-Final Action (Ib Refusal) Prepared For Review
Feb 16, 2011
Non-Final Action Written
Feb 9, 2011
Assigned To Examiner
Jan 25, 2011
Application Filing Receipt Mailed
Jan 21, 2011
New Application Office Supplied Data Entered In Tram
Jan 20, 2011
Sn Assigned For Sect 66a Appl From Ib

Trademark Alertz updated from USPTO on 2030-01-24