Trademark: 79084216
Word
JUWI
Status
Registered
Status Code
707
Status Date
Friday, December 8, 2023
Serial Number
79084216
Registration Number
4219861
Registration Date
Tuesday, October 9, 2012
Mark Type
4000
Filing Date
Monday, March 8, 2010
Published for Opposition
Tuesday, July 24, 2012

Trademark Owner History
JUWI GmbH - Original Registrant
juwi Holding AG - Owner At Publication

Classifications
41 [ Providing of training in the fields of the energy management, renewable energies, solar energy, wind power, biogas energy, geothermal energy, hydro power, pump storage energy and sustainable development; providing of training and workshops in the fields of the manufacture, installation and repair of power-generating apparatus; publication of books and brochures in the fields of energy management, renewable energies, solar energy, wind power, biogas energy, geothermal energy, hydro power, pump storage energy and sustainable development; arranging and conducting educational conferences, meetings, and seminars in the fields of energy management, renewable energies, solar energy, wind power, biogas energy, geothermal energy, hydro power, pump storage energy and sustainable development ]
40 [ Soil processing and treatment; environmental remediation services in the nature of treatment of topsoil and other nutritious soil; treatment of waste, in particular the conversion of waste in the ground; processing and treatment of wood, oil, gas, natural resources and fuels for the generation of energy and current; assembly of vehicles and electric vehicles for others; electricity generation; power generation through the use of water; power generation through the use of geothermal energy ]
9 [Electronic sensors for measuring solar radiation; apparatus and instruments for generating, distributing or accumulating electricity, namely, electric power supplies; apparatus and instruments for the supervision, remote control, checking and measuring of electricity and energy consumption and for the operation of power stations, namely, remote control software and hardware, instruments for measuring electricity and energy consumption, and energy meters; apparatus and instruments for transforming electricity, namely, electric voltage transformer; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, namely, rechargeable batteries and switchgears; apparatus for analyzing signals, current and voltage, namely, electronic monitors and monitor modules for monitoring electric current and electrical signals and voltage monitor modules; apparatus for overvoltage protection against lightning strikes, namely, voltage surge protectors; electric cables, electric connection equipment, namely, electric connectors, electric transformers for the distribution and generation of electricity and energy; solar cells; photovoltaic modules; data processing equipment, namely, data processors, software and recorded computer programs for use in the generation, distribution, storage and control of energy and electricity]
7 [ Electrical power generators using solar cells; wind mills, wind power plants, wind turbines and other wind-operated machines, namely, wind turbines; spare parts and accessories for the aforesaid goods, namely, wind turbine towers and masts, rotor blades, rotor hubs, housings, machine foundations, rotation device, yaw rings and gearboxes; replacement parts and accessories for the aforesaid goods]
39 [Utility services, namely, transmission and distribution of electricity; utility services, namely, transmission and distribution of electricity and electrical energy; information services with regard to the aforesaid services]
4 [ Wood-based fuels, in particular wood pellets ]
37 Construction of power stations, [windmills, wind farms, wind turbines and other wind-powered machines, biogas installations,] solar installations, photovoltaic installations, [geothermal installations, hydroelectric power stations,] pump storage installations; [construction of charging and service stations for electric vehicles;] installation of photovoltaic installations, solar thermal installations, windmills, wind farms, wind turbines, [other wind-powered machines, biogas installations,] [geothermal power plants, hydroelectric power stations,] [pump storage systems] maintenance and repair of photovoltaic installations, solar thermal installations, windmills, wind farms, wind turbines, other wind-powered machines, biogas installations, [geothermal power plants, hydroelectric power stations,] [pump storage systems;] installation, maintenance and repair of power stations and power station systems, and installation, maintenance and repair of electrical equipment; construction of power stations; construction of charging and service stations for electric vehicles; consultancy and information in connection with all the aforesaid services
36 [Insurance administration, financial affairs, namely, financial consulting, monetary affairs, namely, monetary exchange, real estate brokerage;] real estate procurement for others, namely, procurement of suitable sites for power stations
35 [Business management for the energy sector; advertising agencies; business management in the field of energy; providing office functions in the energy sector;] professional business management and commercial management of the financing, construction and operational management of power stations, windmills, wind farms, wind turbines and other wind-powered machines, [biogas installations,] solar installations and photovoltaic installations, [geothermal installations, hydroelectric power stations,] pump storage installations
45 [ Legal consultancy with regard to energy projects; legal services, namely, providing legal assistance with regard to approval procedures for power stations ]
11 [Heating equipment, namely, boilers, fermenters, being parts of biogas installations; fireplaces; solar thermal installations, namely, solar thermal modules, photovoltaic installations, namely, photovoltaic-based plants, geothermal installations, namely, geothermal-based HVAC units, hydro-electric power plants; pump storage installations, namely, hydrogen generators; waste processing plants]
42 Technical planning of photovoltaic installations, solar installations, windmills, wind farms, wind turbines, other wind-powered machines, [biogas installations, geothermal installations,] hydroelectric power stations [, pump storage installations and power stations] ; technical consultancy with regard to development and design of photovoltaic installations, solar installations, windmills, wind farms, wind turbines, other wind-powered machines, [biogas installations, geothermal installations,] hydroelectric power stations [, pump storage installations and power stations]; development of power stations, specialist engineering services and consultancy in the field of engineering; [research and development of new products in the field of renewable energies; geological calculations for the extraction of natural resources for the generation of energy and energy products; preparation of technical reports regarding the optimization of the production of renew able energy and the energy saving, and product development in the power and energy section; research and consultancy in the field of environmental protection and environmental impact assessment with regard to power stations and the energy sector; technical monitoring of the energy performance of apparatus, installations and buildings; development of technical materials, namely, drafting of construction plans used to construct photovoltaic installations, solar installations, windmills, wind farms, wind turbines, other wind-powered machines, biogas installations, geothermal installations, hydroelectric power stations, pump storage installations and power stations all in the energy sector;] design of power stations, windmills, wind farms, wind turbines and other wind-powered machines, [biogas installations,] solar installations, photovoltaic installations, [geothermal installations, hydroelectric power stations,] pump storage installations [; design of vehicles and electric vehicles; design of charging and service stations for electric vehicles; measurement evaluations in the fields of wind power, biogas and solar energy systems]
The word "JUWI" has no meaning in a foreign language.

Trademark Events
Dec 8, 2023
Notice Of Acceptance Of Sec. 71 - E-Mailed
Dec 8, 2023
Registered - Partial Sec 71 Accepted
Nov 16, 2023
Case Assigned To Post Registration Paralegal
Jul 28, 2023
New Representative At Ib Received
Apr 10, 2023
Teas Section 71 Received
Oct 29, 2022
Change Of Name/Address Rec'd From Ib
Oct 9, 2021
Courtesy Reminder - Sec. 71 (10-Yr) E-Mailed
Mar 26, 2020
International Registration Renewed
Feb 20, 2020
Change Of Name/Address Rec'd From Ib
Oct 18, 2019
Partial Invalidation Processed By The Ib
Sep 5, 2019
New Representative At Ib Received
Jul 18, 2019
Partial Invalidation Of Reg Ext Protection Sent To Ib
Jul 18, 2019
Invalidation Processed
Jun 22, 2019
Partial Invalidation Of Reg Ext Protection Created
Apr 19, 2019
New Representative At Ib Received
Oct 22, 2018
Notice Of Acceptance Of Sec. 71 - E-Mailed
Oct 22, 2018
Registered - Partial Sec 71 Accepted
Oct 17, 2018
Case Assigned To Post Registration Paralegal
Oct 8, 2018
Teas Section 71 Received
Feb 19, 2013
Final Decision Transaction Processed By Ib
Jan 28, 2013
Final Disposition Notice Sent To Ib
Jan 28, 2013
Final Disposition Processed
Jan 9, 2013
Final Disposition Notice Created, To Be Sent To Ib
Oct 24, 2012
Notification Of Possible Opposition - Processed By Ib
Oct 9, 2012
Registered-Principal Register
Sep 22, 2012
Notification Processed By Ib
Jul 24, 2012
Published For Opposition
Jul 4, 2012
Notification Of Possible Opposition Sent To Ib
Jul 4, 2012
Notice Of Start Of Opposition Period Created, To Be Sent To Ib
Jul 4, 2012
Notice Of Publication
Jun 20, 2012
Law Office Publication Review Completed
Jun 19, 2012
Examiners Amendment Mailed
Jun 19, 2012
Approved For Pub - Principal Register
Jun 19, 2012
Examiner's Amendment Entered
Jun 19, 2012
Examiners Amendment -Written
Dec 28, 2011
Notification Of Possible Opposition Sent To Ib
Dec 28, 2011
Notification Of Possible Opposition Created, To Be Sent To Ib
Nov 22, 2011
Continuation Of Final Refusal Mailed
Nov 21, 2011
Action Continuing A Final - Completed
Oct 31, 2011
Amendment From Applicant Entered
Oct 31, 2011
Correspondence Received In Law Office
Oct 24, 2011
Paper Received
Sep 6, 2011
Notice Of Unresponsive Amendment - Mailed
Sep 3, 2011
Report Unresponsive Amendment - Completed
Aug 23, 2011
Amendment From Applicant Entered
Aug 23, 2011
Correspondence Received In Law Office
Aug 17, 2011
Paper Received
Apr 28, 2011
Final Refusal Mailed
Apr 27, 2011
Final Refusal Written
Apr 7, 2011
Amendment From Applicant Entered
Apr 7, 2011
Correspondence Received In Law Office
Feb 2, 2011
Assigned To Lie
Jan 27, 2011
Paper Received
Jan 24, 2011
Paper Received
Aug 28, 2010
Refusal Processed By Ib
Jul 27, 2010
Non-Final Action Mailed - Refusal Sent To Ib
Jul 27, 2010
Refusal Processed By Mpu
Jul 27, 2010
Application Filing Receipt Mailed
Jul 27, 2010
Non-Final Action (Ib Refusal) Prepared For Review
Jul 26, 2010
Non-Final Action Written
Jul 23, 2010
Assigned To Examiner
Jul 23, 2010
New Application Office Supplied Data Entered
Jul 22, 2010
Sn Assigned For Sect 66a Appl From Ib

Trademark Alertz updated from USPTO on 2030-01-24