Trademark: 79066663
Word
PREVISIONI: SOLE
Status
Dead
Status Code
402
Status Date
Tuesday, January 22, 2019
Serial Number
79066663
Mark Type
4000
Filing Date
Thursday, January 22, 2009
Abandoned Date
Tuesday, January 22, 2019

Trademark Owner History

Classifications
6 Mounting frames of metal for solar installations, solar modules and laminates; metal building materials; transportable buildings of metal; pipes and tubes of metal
9 Current inverters, charge regulators, batteries, electric cables, electric and electronic measuring and display systems for solar installations, in particular for wind strength, temperature, output and energy; all the aforesaid goods relating to solar energy; photovoltaic installations being individual units, and components therefor, in particular solar modules of sizilium or other semiconductors
11 Solar installations for generating electrical or thermal energy from the sun's rays, and parts therefor; thermal solar collectors; all the aforesaid goods relating to solar energy; solar cookers, heat pumps, heat recovery systems, heat accumulators, heat exchangers
19 Mounting poles, not of metal; reinforcing materials, not of metal, for building; asphalt; joists, not of metal; huts; building timber and structural timber; building materials, not of metal; buildings, not of metal; concrete; concrete building elements; bituminous products for building; roof coverings, not of metal; building cardboard (asphalted); tiles, not of metal; scantlings (carpentry); roofs, not of metal, with integrated solar cells; drain pipes, not of metal; refractory materials; scaffolding, not of metal; xylolith; gravel; artificial stone; posts, not of metal; rigid pipes, not of metal, for building; props, not of metal; posts, not of metal, for electric power lines; tanks of masonry; framework, not of metal, for building
35 Advertising; business management; business administration; office functions; business management preparation of building projects and construction work, in particular for energy recovery installations; business organisation consultancy; organisational project management; management of energy recovery projects in the planning and start-up phase, as well as during the implementation phase
36 Insurance; financial affairs; monetary affairs; real estate affairs; financial management services in the field of building construction and building projects; development of use concepts from a financial viewpoint; real estate management; financial management of facilities, namely management of buildings and installations of all kinds
37 Building construction; repair of construction machines, construction equipment and water vehicles; installation services, namely process technology installations for environmental technology; construction information; building construction supervision; building construction monitoring; building construction, namely implementation of building projects; building construction, civil engineering; building construction supervision
42 Architectural consultancy; architecture, surveying, geological surveys; surveying, research and development for others, technical project studies; building construction, namely technical preparation of building projects; engineering drawing; technical measuring and testing laboratory services; construction drafting; physics (research); environmental impact assessments

Trademark Events
Aug 24, 2019
Notification Of Effect Of Cancellation Of Intl Reg Mailed
Aug 23, 2019
Death Of International Registration
May 18, 2018
New Representative At Ib Received
Feb 22, 2018
New Representative At Ib Received
May 1, 2015
New Representative At Ib Received
Jul 13, 2013
New Representative At Ib Received
Dec 11, 2010
Final Decision Transaction Processed By Ib
Nov 22, 2010
Final Disposition Notice Sent To Ib
Nov 22, 2010
Final Disposition Notice Created, To Be Sent To Ib
Sep 24, 2010
Notification Of Possible Opposition - Processed By Ib
Sep 9, 2010
Notification Of Possible Opposition Sent To Ib
Sep 9, 2010
Notification Of Possible Opposition Created, To Be Sent To Ib
Nov 23, 2009
Abandonment Notice Mailed - Failure To Respond
Nov 22, 2009
Abandonment - Failure To Respond Or Late Response
May 15, 2009
Refusal Processed By Ib
Apr 21, 2009
Non-Final Action Mailed - Refusal Sent To Ib
Apr 21, 2009
Refusal Processed By Mpu
Apr 21, 2009
Non-Final Action (Ib Refusal) Prepared For Review
Apr 20, 2009
Non-Final Action Written
Apr 14, 2009
Application Filing Receipt Mailed
Apr 10, 2009
Assigned To Examiner
Apr 10, 2009
New Application Office Supplied Data Entered In Tram
Apr 9, 2009
Sn Assigned For Sect 66a Appl From Ib

Trademark Alertz updated from USPTO on 2030-01-24