Trademark: 79065654
Word
POWERBLADES
Status
Dead
Status Code
404
Status Date
Thursday, November 1, 2018
Serial Number
79065654
Registration Number
3995734
Registration Date
Tuesday, July 19, 2011
Mark Type
3000
Filing Date
Friday, October 31, 2008
Published for Opposition
Tuesday, May 3, 2011
Cancellation Date
Thursday, November 1, 2018

Trademark Owner History
SENVION GmbH - Original Registrant
REpower Systems AG - Owner At Publication

Classifications
6 Masts and towers of metal for wind power plants; building materials of metal for constructing of machine foundations of wind power plants, namely, foundation plates, foundation flanges, foundation mounting material, metal reinforcement materials for building
7 Machines for generating and converting energy and installations constructed therefrom, namely, wind turbines, wind powered electricity generators and wind-powered machines for generating electrical and mechanical energy, in particular wind turbines, except for land vehicles; replacement parts and accessories for the aforesaid wind powered machines, in particular rotor blades, rotor consoles, blade hubs, machine housings, yaw rings, yaw gears, brakes, main drive shafts, universal joints, gears for wind power generating machines, gear boxes, couplings, motors, mechanical rotor adjusters, electric generators and emergency power supplies
9 Switch cabinets for recording, processing, storage and transmission of data from wind power plants and wind farms; switch cabinets for controlling actuator systems for wind power plants and wind farms, electrical voltage and current regulators for wind power plants; electric or electronic controllers for wind power plants, electric or electronic monitors, meters and sensors for measuring turbine performance and power generation in wind power plants, instruments for regulating, checking, controlling and monitoring energy produced by wind power plants; computer operating software, data processing equipment and computers; computer interfaces and computer programs for monitoring and regulating wind power plants and wind farms; voltage surge protectors and suppressors for lightning protection; electric or electronic vibration sensors for installation in wind power plants; electric or electronic watt-hour meters; electric converters and transformers for wind power plants
35 Professional business consultancy with regard to wind power plants and wind farms
37 Building construction in the field of wind power plants; installation services, namely, installation of towers, turbines, electrical and computer systems for wind power plants and farms; maintenance and rebuilding machines that have been worn or partially destroyed; care and repair of wind power plants; assembly of rotor blades during and as part of installation of equipment for wind power plants and wind farms
38 Telecommunications, in particular electronic transmission of data of wind power plants and wind farms
42 Remote maintenance, remote control and remote monitoring through computerized retrieval of wind power plants and wind farms, in particular via the Internet; performing technical measurements in the field of wind power plants and wind farms, inspections of wind power plants and wind farms, calculating wind flow produced by wind power and wind farms; electronic data storage; surveying and analyzing data from wind power plants and wind farms; design and development of computer software in the field of wind power plants and wind farms; technical consultancy, technical planning and development services as well as technical project management in matters of wind power plants projects; engineering services for calculation, layout and design of rotor blades; technical research in the field of wind power plants and wind farms; providing technical information in the field of energy production through power plants and wind farm; technical monitoring of the condition of rotor blades
Color is not claimed as a feature of the mark.
"POWER BLADES" FOR CLASSES 6, 7, 37 AND 42
The mark consists of the wording "POWERBLADES" in stylized font with a stylized horizontal blade above the wording.
POWER BLADES

Trademark Events
May 24, 2019
Notification Of Effect Of Cancellation Of Intl Reg Mailed
May 24, 2019
Death Of International Registration
Dec 14, 2018
Total Invalidation Processed By The Ib
Nov 5, 2018
Total Invalidation Of Reg Ext Protection Sent To Ib
Nov 5, 2018
Invalidation Processed
Oct 23, 2018
Total Invalidation Of Reg Ext Protection Created
Feb 23, 2018
Cancelled Section 71
May 23, 2017
Review Of Correspondence Complete - Address Updated
Jan 31, 2017
Correspondence Received In Law Office
Sep 4, 2015
Change Of Name/Address Rec'd From Ib
Jul 3, 2014
Change Of Name/Address Rec'd From Ib
Feb 10, 2012
Final Decision Transaction Processed By Ib
Jan 24, 2012
Final Disposition Notice Sent To Ib
Jan 24, 2012
Final Disposition Processed
Oct 19, 2011
Final Disposition Notice Created, To Be Sent To Ib
Jul 19, 2011
Registered-Principal Register
May 3, 2011
Published For Opposition
Apr 30, 2011
Notification Of Possible Opposition - Processed By Ib
Apr 13, 2011
Notification Of Possible Opposition Sent To Ib
Apr 13, 2011
Notice Of Start Of Opposition Period Created, To Be Sent To Ib
Apr 13, 2011
Notice Of Publication
Mar 31, 2011
Law Office Publication Review Completed
Mar 26, 2011
Approved For Pub - Principal Register
Mar 25, 2011
Amendment From Applicant Entered
Mar 25, 2011
Correspondence Received In Law Office
Mar 14, 2011
Paper Received
Sep 20, 2010
Final Refusal Mailed
Sep 18, 2010
Final Refusal Written
Sep 3, 2010
Notification Of Possible Opposition - Processed By Ib
Aug 19, 2010
Notification Of Possible Opposition Sent To Ib
Aug 19, 2010
Notification Of Possible Opposition Created, To Be Sent To Ib
Aug 14, 2010
Amendment From Applicant Entered
Aug 14, 2010
Correspondence Received In Law Office
Aug 14, 2010
Assigned To Lie
Jul 30, 2010
Paper Received
Jan 29, 2010
Non-Final Action Mailed
Jan 28, 2010
Non-Final Action Written
Jan 4, 2010
Amendment From Applicant Entered
Jan 4, 2010
Correspondence Received In Law Office
Dec 28, 2009
Assigned To Lie
Dec 28, 2009
Paper Received
Oct 1, 2009
Non-Final Action Mailed
Sep 30, 2009
Non-Final Action Written
Sep 1, 2009
Amendment From Applicant Entered
Sep 1, 2009
Correspondence Received In Law Office
Sep 1, 2009
Assigned To Lie
Aug 21, 2009
Paper Received
Apr 23, 2009
Refusal Processed By Ib
Mar 30, 2009
Non-Final Action Mailed - Refusal Sent To Ib
Mar 30, 2009
Refusal Processed By Mpu
Mar 28, 2009
Non-Final Action (Ib Refusal) Prepared For Review
Mar 27, 2009
Non-Final Action Written
Mar 24, 2009
Application Filing Receipt Mailed
Mar 20, 2009
Assigned To Examiner
Mar 20, 2009
New Application Office Supplied Data Entered In Tram
Mar 19, 2009
Sn Assigned For Sect 66a Appl From Ib

Trademark Alertz updated from USPTO on 2030-01-24