Trademark: 78973613
Word
D
Status
Registered
Status Code
800
Status Date
Monday, January 8, 2018
Serial Number
78973613
Registration Number
3370920
Registration Date
Tuesday, January 15, 2008
Mark Type
3000
Filing Date
Wednesday, September 13, 2006
Published for Opposition
Tuesday, May 29, 2007

Trademark Owner History

Classifications
42 Civil engineering and infrastructure planning services; Airport infrastructure services, namely location studies, airport master planning, construction administration and inspection, design and construction surveys and design of runways, taxiways, parking aprons, t-hangars, grading, pavement rehabilitation, drainage, detention basins, street systems, parking facilities, utilities, fencing and security/access control systems, fuel storage, site infrastructure for airport terminals and building facilities, Drainage and flood control engineering services, namely design of detention/retention basins, open channels, river works, storm drains, drop structures, energy dissipators, spillways, culverts, scour and bank protection, dams; Drainage and flood control engineering services, namely area drainage master studies and plans, preliminary design, administration and inspection, design and construction surveys, flood insurance studies, drainage manuals, 404 permits/401 certification, floodplain delineations, FEMA CLOMR/LOMR, bridge scour analysis, hydrologic and hydraulic modeling and analysis, sediment transport, erosion and degradation studies, two-dimensional modeling and benefit-cost analysis, inundation studies, emergency action plans (EAP), flood damage and risk assessment, dambreak modeling and flood hazard mapping, floodplain delineation and mapping, stream navigability, erosion setback evaluation and mapping; Site infrastructure engineering services, namely fire protection supply, gas services, grading and drainage, master planning, water/sewer system modeling, municipal coordination/permits, NPDES/stormwater permits, off site improvements, retention/detention, traffic analysis, underground, at-grade and elevated parking and water/sewer services; Engineering survey services, namely control surveys, three dimensional imaging, topographic surveys, boundary surveys, right-of-way/easement surveys, global positioning surveys, photogrammetry control surveys, ALTA/ACSM surveys, construction staking, as-built surveys; Geographic information system services, namely asset inventory and management involving water and wastewater, storm drainage, water distribution, and gas pipeline systems, data collection and conversion, street centerlines, database design, development, and management, VB/VBA programming and avenue scripting, web development, data deployment, maintenance, and management, integration of water distribution systems into GIS, integration of sanitary sewer systems into GIS, integration of storm drainage systems into GIS, fire hazard evaluation and mapping; Transportation engineering services, namely major street design, highway location studies, highway design concept reports, highway/freeway design, street systems, sidewalk improvements, roadway signing/striping design, traffic impact analysis, traffic interchange design, traffic control plans, drainage analysis and design, right-of-way analysis and plans, legal descriptions and exhibits, utility design and relocations, construction administration/inspection, quality assurance/quality control, constructability reviews, comprehensive project management, partnering/teamwork leadership, public involvement, agency coordination, English and metric capabilities, parks and trails, utility and agency coordination; Water resource engineering services, namely transmission/distribution main design, booster pump station design, reservoir design, well design, pipeline rehabilitation, water system appraisals, water and sewer master planning, sanitary sewer main design, lift station design, effluent reuse/reclaimed pipelines, water/waste water treatment, irrigation delivery systems, gas pipeline design, infrastructure rehabilitation, agency coordination, phased implementation planning and public involvement programs
Color is not claimed as a feature of the mark.
The mark consists of the letter D in a shaded circle.
DIBBLE

Trademark Events
Jan 8, 2018
Notice Of Acceptance Of Sec. 8 & 9 - E-Mailed
Jan 8, 2018
Registered And Renewed (First Renewal - 10 Yrs)
Jan 8, 2018
Registered - Sec. 8 (10-Yr) Accepted/Sec. 9 Granted
Jan 8, 2018
Case Assigned To Post Registration Paralegal
Dec 8, 2017
Teas Section 8 & 9 Received
Jan 15, 2017
Courtesy Reminder - Sec. 8 (10-Yr)/Sec. 9 E-Mailed
Oct 10, 2013
Notice Of Acceptance Of Sec. 8 & 15 - E-Mailed
Oct 10, 2013
Registered - Sec. 8 (6-Yr) Accepted & Sec. 15 Ack.
Oct 3, 2013
Registered - Sec. 8 (6-Yr) & Sec. 15 Filed
Oct 10, 2013
Case Assigned To Post Registration Paralegal
Oct 3, 2013
Teas Section 8 & 15 Received
Jan 15, 2008
Registered-Principal Register
Dec 12, 2007
Law Office Registration Review Completed
Nov 27, 2007
Allowed Principal Register - Sou Accepted
Nov 13, 2007
Statement Of Use Processing Complete
Oct 30, 2007
Use Amendment Filed
Oct 30, 2007
Teas Statement Of Use Received
Aug 21, 2007
Noa Mailed - Sou Required From Applicant
May 29, 2007
Published For Opposition
May 9, 2007
Notice Of Publication
Mar 28, 2007
Law Office Publication Review Completed
Mar 23, 2007
Assigned To Lie
Feb 27, 2007
Approved For Pub - Principal Register
Feb 26, 2007
Examiner's Amendment Entered
Feb 26, 2007
Examiners Amendment E-Mailed
Feb 26, 2007
Examiners Amendment -Written
Feb 9, 2007
Non-Final Action E-Mailed
Feb 9, 2007
Non-Final Action Written
Feb 5, 2007
Assigned To Examiner
Sep 20, 2006
Notice Of Design Search Code Mailed
Sep 19, 2006
New Application Entered In Tram

Trademark Alertz updated from USPTO on 2030-01-24