Trademark: 78973607
Word
DIBBLE ENGINEERING
Status
Registered
Status Code
800
Status Date
Thursday, October 5, 2017
Serial Number
78973607
Registration Number
3298142
Registration Date
Tuesday, September 25, 2007
Mark Type
4000
Filing Date
Wednesday, September 13, 2006
Published for Opposition
Tuesday, July 10, 2007

Trademark Owner History

Classifications
42 Civil engineering and infrastructure planning services; Airport infrastructure services, namely location studies, airport master planning, inspection, design and construction surveys and design of runways, taxiways, parking aprons, t-hangars, grading, pavement rehabilitation, drainage, detention basins, street systems, parking facilities, utilities, fencing and security/access control systems, fuel storage, site infrastructure for airport terminals and building facilities; Drainage and flood control engineering services, namely design of detention/retention basins, open channels, river works, storm drains, drop structures, energy disipators, spillways, culvertss, scour and bank protection, dams; Drainage and flood control engineering services, namely area drainage master studies and plans, preliminary design, administration and inspection, design and construction surveys, flood insurance studies, drainage manuals, 404 permits/401 certification, floodplain delineations, FEMA CLOMR/LOMR, bridge scour analysis, hydrologic and hydraulic modeling and analysis, sediment transport, erosion and degradation studies, two-dimensional modeling and benefit-cost analysis, inundation studies, emergency action plans (EAP), flood damage and risk assessment, dambreak modeling and flood hazard mapping, floodplain delineation and mapping, stream navigability, erosion setback evaluation and mapping; Site infrastructure engineering services, namely fire protection supply, gas services, grading and drainage, master planning, water/sewer system modeling, municipal coordination/permits, NPDES/stormwater permits, off site improvements, retention/detention, traffic analysis, underground, at-grade and elevated parking and water/sewer services; Engineering survey services, namely control surveys, three dimensional imaging, topographic surveys, boundary surveys, right-of-way/easement surveys, global positioning surveys, photogrammetry control surveys, ALTA/ACSM surveys, construction staking, as-built surveys; Geographic information system services, namely asset inventory and management involving water and wastewater, storm drainage, water distribution, and gas pipeline systems, data collection and conversion, street centerlines, database design, development, and management, VB/VBA programming and avenue scripting, web development, data deployment, maintenance, and management, integration of water distribution systems into GIS, integration of sanitary sewer systems into GIS, integration of storm drainage systems into GIS, fire hazard evaluation and mapping; Transportation engineering services, namely major street design, highway location studies, highway design concept reports, highway/freeway design, street systems, sidewalk improvements, roadway signing/striping design, traffic impact analysis, traffic interchange design, traffic control plans, drainage analysis and design, right-of-way analysis and plans, legal descriptions and exhibits, utility design and relocations, construction administration/inspection, quality assurance/quality control, constructability reviews, comprehensive project management, partnering/teamwork leadership, public involvement, agency coordination, English and metric capabilities, parks and trails, utility and agency coordination; Water resource engineering services, namely transmission/distribution main design, booster pump station design, reservoir design, well design, pipeline rehabilitation, water system appraisals, water and sewer master planning, sanitary sewer main design, lift station design, effluent reuse/reclaimed pipelines, water/waste water treatment, irrigation delivery systems, gas pipeline design, infrastructure rehabilitation, agency coordination, phased implementation planning and public involvement programs
In the statement, Page 2, Column 1, line 19, " and " is deleted.
"ENGINEERING"
as to "DIBBLE"

Trademark Events
Oct 5, 2017
Notice Of Acceptance Of Sec. 8 & 9 - E-Mailed
Oct 5, 2017
Registered And Renewed (First Renewal - 10 Yrs)
Oct 5, 2017
Registered - Sec. 8 (10-Yr) Accepted/Sec. 9 Granted
Oct 5, 2017
Case Assigned To Post Registration Paralegal
Sep 1, 2017
Teas Section 8 & 9 Received
Jul 12, 2017
Applicant/Correspondence Changes (Non-Responsive) Entered
Jul 12, 2017
Teas Change Of Owner Address Received
Sep 25, 2016
Courtesy Reminder - Sec. 8 (10-Yr)/Sec. 9 E-Mailed
Sep 13, 2013
Notice Of Acceptance Of Sec. 8 & 15 - E-Mailed
Sep 13, 2013
Registered - Sec. 8 (6-Yr) Accepted & Sec. 15 Ack.
Aug 30, 2013
Registered - Sec. 8 (6-Yr) & Sec. 15 Filed
Sep 13, 2013
Case Assigned To Post Registration Paralegal
Aug 30, 2013
Teas Section 8 & 15 Received
Jan 18, 2008
Amendment Under Section 7 - Issued
Dec 12, 2007
Assigned To Paralegal
Nov 7, 2007
Sec 7 Request Filed
Nov 7, 2007
Paper Received
Sep 25, 2007
Registered-Principal Register
Jul 10, 2007
Published For Opposition
Jun 20, 2007
Notice Of Publication
Apr 30, 2007
Law Office Publication Review Completed
Apr 24, 2007
Approved For Pub - Principal Register
Apr 23, 2007
Teas/Email Correspondence Entered
Apr 23, 2007
Correspondence Received In Law Office
Apr 20, 2007
Teas Response To Office Action Received
Apr 18, 2007
Use Amendment Accepted
Apr 17, 2007
Teas/Email Correspondence Entered
Apr 17, 2007
Correspondence Received In Law Office
Apr 17, 2007
Amendment To Use Processing Complete
Mar 23, 2007
Use Amendment Filed
Apr 17, 2007
Assigned To Lie
Mar 23, 2007
Teas Amendment Of Use Received
Mar 7, 2007
Non-Final Action E-Mailed
Mar 7, 2007
Non-Final Action Written
Mar 3, 2007
Teas/Email Correspondence Entered
Mar 2, 2007
Correspondence Received In Law Office
Mar 2, 2007
Teas Response To Office Action Received
Feb 9, 2007
Non-Final Action E-Mailed
Feb 9, 2007
Non-Final Action Written
Feb 5, 2007
Assigned To Examiner
Sep 19, 2006
New Application Entered In Tram

Trademark Alertz updated from USPTO on 2030-01-24