Trademark: 78446872
Word
VAPORTECH
Status
Dead
Status Code
710
Status Date
Friday, February 14, 2014
Serial Number
78446872
Registration Number
3259963
Registration Date
Tuesday, July 10, 2007
Mark Type
4000
Filing Date
Wednesday, July 7, 2004
Published for Opposition
Tuesday, January 2, 2007
Cancellation Date
Friday, February 14, 2014

Trademark Owner History
Vaportech Energy Services Inc. - Original Registrant

Classifications
7 Natural gas compression units used for vapor recovery and fugitive gas collection and compression, condensate liquids collection and handling, booster gas compression and flare and vent gas compression all used for the collection and transportation of natural gas and natural gas liquids; Plunger lift systems and related equipment comprising a wellhead lubricator, receiver, arrival sensor, wellhead chambering, sold ring plungers, pad plungers, brush plungers, element sealed plungers, downhole bumper springs and associated equipment and peripherals sold together as a unit; gas and oil well optimization equipment, namely, wellhead piping, connectors and wireline retrieval tools designed specifically for plunger lift; low friction heavy oil rod-pumping equipment for use in primary heavy production; electronic submersible progressive cavity pumping equipment for use in relation to oil, gas and water wells; Artificial lift systems, namely downhole mechanical pumps and electric submersible pumps that use either the natural energy of a producing well or external power to cause the device to lift oil or water from wells; and gas recovery compression systems, namely, gas compression units designed to recover natural gas from land fills and recover fugitive emissions in chemical plants
9 Computer modeling software to predict and optimize gas and oil well production; computer modeling software to track gas and oil well production
37 Installation, and field servicing of compressor packages and systems, namely, a compressor, engine, cooling systems for pressurized gas and liquids, process piping and spooling, pressure vessels, electrical and instrument process controls, floor and structural steel skid, building enclosure and associated peripherals for oilfield, gas/oil processing plant and refinery applications; Installation, and field servicing, of compressor packages and systems, namely, a compressor, engine, cooling systems for pressurized gas and liquids, process piping and spooling, pressure vessels, electrical and instrument process controls, floor and structural steel skid, building enclosure and associated peripherals, used primarily for recovery of fugitive emissions from storage tanks, pressurized and non-pressurized vessels, dehydrator stills, treaters, separators, and tanks; Installation, and field servicing of oilfield production tools installed on surface wellheads and at the bottom of producing oil and gas wells to enhance and optimize production; Field services, repair and maintenance services on oil and gas wells; Installation of low horsepower field booster compressors; Installation, and field servicing of Artificial Lift systems to lift oil and water from wells; Field services, repair and maintenance on Artificial Lift systems; and Evaluation, installation, and servicing of compressor packages and systems designed to recover natural gas from land fills and recover fugitive emissions in chemical plants
40 Construction of compressor packages and systems, namely, a compressor, engine, cooling systems for pressurized gas and liquids, process piping and spooling, pressure vessels, electrical and instrument process controls, floor and structural steel skid, building enclosure and associated peripherals for oilfield, gas/oil processing plant and refinery applications; Construction of compressor packages and systems, namely, a compressor, engine, cooling systems for pressurized gas and liquids, process piping and spooling, pressure vessels, electrical and instrument process controls, floor and structural steel skid, building enclosure and associated peripherals, used primarily for recovery of fugitive emissions from storage tanks, pressurized and non-pressurized vessels, dehydrator stills, treaters, separators, and tanks; Construction of oilfield production tools installed on surface wellheads and at the bottom of producing oil and gas wells to enhance and optimize production; Construction of low horsepower field booster compressors; Construction of Artificial Lift systems to lift oil and water from wells; and construction of compressor packages and systems designed to recover natural gas from land fills and recover fugitive emissions in chemical plants, all to the order and specification of others
42 Engineering and design of compressor packages and systems, namely, a compressor, engine, cooling systems for pressurized gas and liquids, process piping and spooling, pressure vessels, electrical and instrument process controls, floor and structural steel skid, building enclosure and associated peripherals for oilfield, gas/oil processing plant and refinery applications; Engineering and design, of compressor packages and systems, namely, a compressor, engine, cooling systems for pressurized gas and liquids, process piping and spooling, pressure vessels, electrical and instrument process controls, floor and structural steel skid, building enclosure and associated peripherals, used primarily for recovery of fugitive emissions from storage tanks, pressurized and non-pressurized vessels, dehydrator stills, treaters, separators, and tanks; Evaluation of refinery and oilfield applications to determine the need and specification for the wares described herein, including the re-design of pre-existing competitive systems that are not functioning according to requirements; Design and design consulting services with respect to the design and supply of complex gas compression and liquid handling equipment, consultation on general arrangement, equipment recommendations, P and ID review, piling layout, process flows and material/equipment selection materials that comprise a compressor unit; Engineering and design of oilfield production tools installed on surface wellheads and at the bottom of producing oil and gas wells to enhance and optimize production; Troubleshooting services on oil and gas wells; Design of low horsepower field booster compressors; Design and design consulting services with respect to the design and supply of well optimization and production equipment, including consultation on equipment recommendations, production and operating techniques and material/equipment selection; Engineering and design of Artificial Lift systems to lift oil and water from wells; Troubleshooting on Artificial Lift systems; and Engineering, design, and trouble shooting of compressor packages and systems designed to recover natural gas from land fills and recover fugitive emissions in chemical plants
VAPOR TECH

Trademark Events
Feb 14, 2014
Cancelled Sec. 8 (6-Yr)
Feb 22, 2010
Teas Change Of Correspondence Received
Jul 10, 2007
Registered-Principal Register
May 18, 2007
Extension Of Time To Oppose Process - Terminated
Jan 25, 2007
Extension Of Time To Oppose Received
Jan 2, 2007
Published For Opposition
Dec 13, 2006
Notice Of Publication
Nov 11, 2006
Law Office Publication Review Completed
Nov 9, 2006
Assigned To Lie
Nov 7, 2006
Approved For Pub - Principal Register
Nov 1, 2006
Examiner's Amendment Entered
Oct 31, 2006
Examiners Amendment E-Mailed
Oct 31, 2006
Examiners Amendment -Written
Oct 23, 2006
Previous Allowance Count Withdrawn
Oct 16, 2006
Withdrawn From Pub - Og Review Query
Sep 23, 2006
Law Office Publication Review Completed
Sep 22, 2006
Assigned To Lie
Sep 19, 2006
Approved For Pub - Principal Register
Aug 31, 2006
Teas/Email Correspondence Entered
Aug 22, 2006
Correspondence Received In Law Office
Aug 22, 2006
Teas Response To Office Action Received
Jul 28, 2006
Teas Change Of Correspondence Received
Jul 24, 2006
Non-Final Action E-Mailed
Jul 24, 2006
Non-Final Action Written
Jul 24, 2006
Previous Allowance Count Withdrawn
Jul 14, 2006
Withdrawn From Pub - Og Review Query
Jun 21, 2006
Law Office Publication Review Completed
Jun 16, 2006
Assigned To Lie
Jun 12, 2006
Approved For Pub - Principal Register
May 24, 2006
Teas/Email Correspondence Entered
May 17, 2006
Correspondence Received In Law Office
May 17, 2006
Teas Response To Office Action Received
Apr 11, 2006
Non-Final Action E-Mailed
Apr 11, 2006
Non-Final Action Written
Mar 17, 2006
Teas/Email Correspondence Entered
Mar 7, 2006
Correspondence Received In Law Office
Mar 7, 2006
Teas Response To Office Action Received
Oct 20, 2005
Correspondence E-Mailed
Oct 20, 2005
Suspension Letter Written
Oct 6, 2005
Amendment From Applicant Entered
Sep 27, 2005
Correspondence Received In Law Office
Sep 27, 2005
Teas Response To Office Action Received
Aug 23, 2005
Letter Of Suspension E-Mailed
Aug 23, 2005
Suspension Letter Written
Jul 21, 2005
Amendment From Applicant Entered
Jul 7, 2005
Correspondence Received In Law Office
Jul 6, 2005
Attorney Revoked And/Or Appointed
Jul 6, 2005
Teas Revoke/Appoint Attorney Received
Jul 7, 2005
Teas Response To Office Action Received
Feb 10, 2005
Non-Final Action E-Mailed
Feb 10, 2005
Non-Final Action Written
Feb 10, 2005
Assigned To Examiner
Jul 13, 2004
New Application Entered In Tram

Trademark Alertz updated from USPTO on 2030-01-24