Trademark: 77127827
Word
DELTARAIL
Status
Dead
Status Code
710
Status Date
Friday, April 20, 2018
Serial Number
77127827
Registration Number
4024335
Registration Date
Tuesday, September 13, 2011
Mark Type
4000
Filing Date
Sunday, March 11, 2007
Published for Opposition
Tuesday, June 28, 2011
Cancellation Date
Friday, April 20, 2018

Trademark Owner History
DeltaRail Group Limited - Original Registrant

Classifications
7 SAFETY EQUIPMENT, NAMELY, ELECTRICALLY OPERATED SANDERS FOR USE ON RAILWAY VEHICLES TO ADDRESS WHEEL/RAIL LOW ADHESION CONDITIONS
9 ELECTRONIC AND ELECTRICAL APPARATUS FOR TRACKING TRAINS, CHECKING RAIL TRACKS, POINTS AND SIGNALING IN THE RAILWAY INDUSTRY; MEASUREMENT AND COMMUNICATION APPARATUS AND DEVICES FOR USE IN TRACKING TRAINS AND PROVIDING REAL-TIME INFORMATION ON TRAIN MOVEMENT, NAMELY ODOMETERS, ELECTRIC GPS SENSORS AND ELECTRONIC INERTIAL SENSORS; COMPUTER SOFTWARE FOR MANAGEMENT OF TRAINS, ROLLING STOCK, RAIL TRACK VEHICLES, RAIL TRACK, POINTS AND SIGNALING SYSTEMS IN THE RAILWAY INDUSTRY; COMPUTER SOFTWARE FOR MANAGEMENT OF RAILWAY NETWORKS; COMPUTER SOFTWARE FOR PROCESSING AND MANAGING SUPPLIES USED IN THE OPERATION AND MAINTENANCE OF THE RAILWAYS AND ROAD TRANSPORT FLEETS; COMPUTER SOFTWARE FOR TRANSACTION PROCESSING AND MANAGEMENT IN RELATION TO OPERATIONAL AND MAINTENANCE ACTIVITIES OF THE RAILWAYS AND ROAD TRANSPORT FLEETS; COMPUTER SOFTWARE FOR ARCHIVING DATA; COMPUTER SOFTWARE FOR SETTING UP, MANAGEMENT AND ADMINISTRATION OF A WEBSITE; COMPUTER SOFTWARE FOR MAIL PROCESSING PURPOSES; RESOURCE MANAGEMENT SOFTWARE FOR MANAGING OPERATIONS STAFF AND MAINTENANCE STAFF IN THE RAILWAY INDUSTRY; COMPUTER SOFTWARE FOR MODELING PERFORMANCE OF RAILWAY VEHICLES AND RAILWAY INFRASTRUCTURE; COMPUTER SOFTWARE FOR MODELING THE COMMAND AND CONTROL OF SIGNALING SYSTEMS, AND FOR SIMULATING RAILWAY OPERATION; COMPUTER HARDWARE AND SOFTWARE FOR DATA ACQUISITION AND MONITORING OF DATA RELATING TO THE CONDITION OF RAILWAY VEHICLES; OPTICAL INSPECTION EQUIPMENT FOR MONITORING COMPONENTS OF RAILWAY VEHICLES, NAMELY CAMERAS AND LASER SCANNERS; ELECTRICAL AND OPTICAL INSTRUMENTS FOR USE ON RAILWAY VEHICLES TO MONITOR RAILWAY LINES, TO MONITOR VEHICLES OR VEHICLE COMPONENTS, INCLUDING AXLES, BEARINGS, WHEELS, DOORS, ENGINES AND BRAKES, TO MONITOR VEHICLE LOADS OR PASSENGERS, AND TO MONITOR INTERACTIONS BETWEEN RAILWAY VEHICLES AND RAILWAY LINES, NAMELY TEMPERATURE SENSORS, VIBRATION SENSORS, NOISE SENSORS, WEIGHT SENSORS AND STRESS SENSORS; MEASURING AND MONITORING SYSTEMS PRIMARILY CONSISTING OF ELECTRIC SENSORS, NAMELY, FRICTION SENSORS, ENGINE POWER SENSORS, SPEED SENSORS, NOISE SENSORS, ACCELEROMETERS, DISPLACEMENT SENSORS AND STRESS SENSORS FOR RAILWAY INFRASTRUCTURE, FOR MONITORING LOW ADHESION AT THE WHEEL/RAIL INTERFACE, FOR MONITORING ENGINE PERFORMANCE, FOR MONITORING PASSENGER COMFORT, FOR MONITORING TRACK GEOMETRY, FOR MONITORING WHEEL-RAIL FORCES, AND FOR MONITORING PANTOGRAPH/OVERHEAD LINE FORCES; ELECTRONIC INSPECTION AND TESTING EQUIPMENT, NAMELY, ACCELEROMETERS, ANEMOMETERS, ANTENNAS, COMPUTER HARDWARE, DATA LOGGERS, DIGITAL CAMERAS, DISPLACEMENT TRANSDUCERS, ELECTRONIC TAGS FOR GOODS, FLOW METERS, HANDHELD COMPUTERS, LASER GENERATORS, POTENTIOMETERS, PRESSURE SENSORS, SOUND LEVEL METERS, TELEMETERS, THERMOCOUPLES, AND WIND VANES, AND COMPUTER HARDWARE AND APPLICATION SOFTWARE FOR MEASURING THE PERFORMANCE OF ENGINES, WHEELS, BRAKES AND ELECTROMAGNETIC EQUIPMENT ON RAILWAY VEHICLES; ELECTRONIC AND ELECTRICAL EQUIPMENT, NAMELY, ACTUATORS, PRESSURE SENSORS, MICRO-SWITCHES, DISPLACEMENT TRANSDUCERS, DATA LOGGERS AND COMPUTER HARDWARE FOR OPERATING RAILWAY VEHICLE DOORS
12 FITTINGS FOR THE INTERIOR AND EXTERIOR OF RAILWAY CARRIAGES AND OTHER RAILWAY VEHICLES, NAMELY, VEHICLE STRUCTURAL BODY PARTS, VEHICLE DOORS, VEHICLE WINDOWS, LUGGAGE RACKS, AND VEHICLE SEATS
35 CONSULTANCY SERVICES IN THE FIELD OF BUSINESS MANAGEMENT AND BUSINESS STRATEGY; PROFESSIONAL BUSINESS CONSULTANCY SERVICES IN THE FIELD OF MONITORING OF RAILWAY VEHICLE AND RAILWAY INFRASTRUCTURE OPERATIONS; BUSINESS CONSULTANCY SERVICES IN THE FIELD OF THE BUSINESS ASSESSMENT AND MANAGEMENT OF TECHNICAL, OPERATIONAL, AND BUSINESS RISKS IN THE RAILWAY INDUSTRY
37 PROFESSIONAL CONSULTANCY SERVICES IN THE FIELD OF SUPERVISING OF CONSTRUCTION OF RAILWAY PLANT; CONSULTANCY SERVICES IN THE FIELD OF REPAIR OF RAILWAY PLANT AND RAILWAY VEHICLES; CONSTRUCTION PROJECT MANAGEMENT SERVICES; CONSTRUCTION PROJECT MANAGEMENT RELATED TO THE MAINTENANCE, REPAIR, REFURBISHMENT AND OVERHAUL OF RAILWAY VEHICLES; CONSTRUCTION PROJECT MANAGEMENT RELATED TO THE CONSTRUCTION, MAINTENANCE, REPAIR, REFURBISHMENT AND OVERHAUL OF RAILWAY INFRASTRUCTURE; CONSULTANCY SERVICES IN THE FIELD OF RAILWAY VEHICLE REFURBISHMENT; MAINTENANCE AND CONSTRUCTION OF RAILWAY INFRASTRUCTURE, NAMELY, BRIDGES, BALLAST, RAIL AND TRACK COMPONENTS; CONSULTANCY SERVICES CONCERNING INSTALLATION AND MAINTENANCE IN THE FIELD OF VENTILATION OF RAILWAY VEHICLES TO ENSURE PASSENGER COMFORT; RAILWAY REPAIR CONSULTANCY SERVICES, NAMELY, CONSULTANCY SERVICES AND ADVICE TO EVALUATE THE NEED FOR REPAIR OF RAILWAY VEHICLES
40 PROFESSIONAL CONSULTANCY SERVICES IN THE FIELD OF THE CONSTRUCTION OF RAILWAY VEHICLES; RAILWAY VEHICLE MANUFACTURING PROJECT MANAGEMENT SERVICES; CONSULTANCY SERVICES IN THE FIELD OF MANUFACTURE OF EQUIPMENT FOR USE AS PART OF RAILWAY INFRASTRUCTURE; CONSULTANCY SERVICES IN THE FIELD OF THE MANUFACTURE OF TRACTION AND ROLLING STOCK FOR RAILWAYS
41 TRAINING SERVICES FOR RAILWAY STAFF BY WAY OF COURSES AND SEMINARS IN THE FIELDS OF RAILWAY OPERATIONS, SIGNALING AND TIMETABLING, IN THE FIELD OF MANAGEMENT AND MAINTENANCE OF RAIL VEHICLES, AND IN THE FIELD OF RAIL VEHICLE DYNAMICS; TRAIN DRIVER TRAINING COURSES ON HOW TO RESPOND TO LOW ADHESION CONDITIONS ON THE RAILWAY
42 ENGINEERING AND SURVEYING OF RAILWAY VEHICLES AND OF RAILWAY TRACK INFRASTRUCTURE; RAILWAY SIGNAL COMMISSIONING, NAMELY TESTING FOR CORRECT SIGNAL OPERATION AFTER INSTALLATION BUT PRIOR TO USE, AND RAILWAY SIGNAL DIAGNOSTIC TESTING SERVICES; CONSULTANCY SERVICES IN THE FIELD OF THE DIAGNOSTICS OF RAILWAY INFRASTRUCTURE; CONSULTANCY SERVICES IN THE FIELD OF RAILWAY INFRASTRUCTURE DESIGN; CONSULTANCY SERVICES IN THE FIELD OF THE DESIGN OF RAILWAY TRACTION AND ROLLING STOCK; TECHNICAL CONSULTANCY SERVICES IN THE FIELD OF ADVISING TRAIN OPERATORS ON MITIGATING LOW ADHESION AT THE WHEEL-RAIL INTERFACE FOR RAILWAY VEHICLES; CONSULTANCY SERVICES IN THE FIELD OF THE DESIGN OF EQUIPMENT FOR USE AS PART OF RAILWAY INFRASTRUCTURE; CONSULTANCY SERVICES IN THE FIELD OF RAILWAY EQUIPMENT QUALITY ASSURANCE SERVICES, AND RAILWAY EQUIPMENT SAFETY TESTING; CONSULTANCY SERVICES IN THE FIELD OF DEVELOPMENT OF TRACTION AND ROLLING STOCK FOR RAILWAYS; EXPERT SCIENTIFIC RESEARCH IN THE FIELD OF RAILWAY ACCIDENT INVESTIGATION, INCLUDING THE COLLECTION OF EVIDENCE AND IDENTIFICATION OF CAUSES; DRAWING UP SCIENTIFIC EXPERT TECHNICAL OPINIONS IN THE FIELD OF RAILWAY ACCIDENTS; CONFORMITY ASSESSMENT AND CERTIFICATION OF RAILWAY SUBSYSTEMS AND CONSTITUENTS, NAMELY, THE TESTING, ANALYSIS AND EVALUATION OF RAILWAY SUBSYSTEMS AND CONSTITUENTS OF OTHERS FOR THE PURPOSE OF CERTIFICATION; SCIENTIFIC SERVICES, NAMELY, MATERIALS TESTING; CONSULTANCY SERVICES IN THE DEVELOPMENT OF VOLUNTARY STANDARDS IN THE FIELD OF THE OPERATION, MAINTENANCE AND REPAIR OF RAILWAY INFRASTRUCTURE, PLANT AND RAILWAY TRACTION AND ROLLING STOCK; CONSULTANCY SERVICES IN THE FIELD OF TESTING AND DEVELOPMENT OF RAILWAY INFRASTRUCTURE, NAMELY, BRIDGES, BALLAST, RAILS AND TRACK COMPONENTS; DESIGN AND DEVELOPMENT OF TRACTION AND ROLLING STOCK FOR RAILWAYS; SCIENTIFIC RESEARCH SERVICES TO PROVIDE AERODYNAMICS EXPERTISE RELATING TO THE DESIGN OF ROLLING STOCK FOR RAILWAYS; CONSULTANCY SERVICES AND ADVICE IN THE FIELD OF TESTING THE CONDITION OF RAILWAY VEHICLES TO SEE WHETHER THEY CONTINUE TO COMPLY WITH STANDARDS SET BY RAILWAY AUTHORITIES; DESIGN SERVICES IN THE FIELD OF ELECTRICAL BUILDING SERVICES ASSOCIATED WITH RAILWAYS, AND RELATING TO ELECTRICAL ENGINEERING FOR RAILWAY INFRASTRUCTURE, NAMELY ELECTRIC POWER SUPPLIES; TESTING SERVICES AND CONSULTANCY SERVICES ON THE ELECTROMAGNETIC COMPATIBILITY OF PRODUCTS INTENDED FOR USE IN THE RAILWAY ENVIRONMENT; CONSULTANCY SERVICES IN THE FIELD OF ERGONOMICS AND HUMAN FACTORS, NAMELY DESIGN OF EQUIPMENT AND SYSTEMS TO OPTIMIZE OPERATIONAL SAFETY, EFFICIENCY AND COMFORT IN THE CONTEXT OF RAILWAYS; CONSULTANCY SERVICES IN THE FIELD OF INFORMATION TECHNOLOGY FOR USE IN THE RAILWAY INDUSTRY; DATABASE DEVELOPMENT; SOFTWARE SERVICES, NAMELY THE DESIGN, SPECIFICATION, DEVELOPMENT, TESTING AND IMPLEMENTATION OF SOFTWARE FOR USE IN RAILWAY OPERATIONS, RAILWAY TIME TABLING, RAILWAY MAINTENANCE AND RAILWAY STAFF ROSTERING; CONFORMITY ASSESSMENT AND CERTIFICATION OF RAILWAY SUBSYSTEMS AND CONSTITUENTS, NAMELY EVALUATION AND CERTIFICATION OF THE GOODS OF OTHERS FOR THE PURPOSE OF CERTIFYING CONFORMITY TO STANDARDS SET BY RAILWAY AUTHORITIES; CONSULTANCY SERVICES IN THE FIELD OF MECHANICAL BUILDING ENGINEERING SERVICES, AND IN THE FIELD OF MECHANICAL ENGINEERING RELATING TO OPERATION OF RAILWAY VEHICLES AND RAILWAY INFRASTRUCTURE AND TO RAILWAY EQUIPMENT AND STRUCTURES, AND TO LUBRICATION AND WEAR OF COMPONENTS; DESIGN SERVICES IN THE FIELD OF RAILWAY INFRASTRUCTURE AND RAILWAY EQUIPMENT AND STRUCTURES; CONSULTANCY SERVICES IN THE FIELD OF THE DESIGN, INSPECTION AND TESTING OF PLANT AND EQUIPMENT, NAMELY COMPONENTS, SUBSYSTEMS AND SYSTEMS FOR USE ON RAILWAY VEHICLES AND RAILWAY INFRASTRUCTURE; CONSULTANCY SERVICES IN THE FIELD OF TESTING AND EVALUATION OF RAILWAY CAR PLANTS AND EQUIPMENT FOR USE ON RAILWAYS, AND IN THE FIELD OF FAILURE INVESTIGATION OF PLANT AND EQUIPMENT USED ON RAILWAYS; CONSULTANCY SERVICES FOR SCIENTIFIC PURPOSES IN THE FIELD OF NOISE AND VIBRATION IN THE RAILWAY ENVIRONMENT; CONSULTANCY SERVICES AND DESIGN SERVICES IN THE FIELD OF THE DESIGN OF RAILWAY INFRASTRUCTURE, THE DESIGN OF TRAIN CONTROL SYSTEMS, THE DESIGN OF SIGNALING SYSTEMS AND THE DESIGN OF ELECTRIFICATION OF RAILWAYS; CONSULTANCY SERVICES AND DESIGN SERVICES IN THE FIELD OF THE DESIGN OF RAILWAY INFRASTRUCTURE, NAMELY LEVEL CROSSINGS, STATIONS, BRIDGES, BALLAST, RAILS AND TRACK COMPONENTS; ACCREDITATION SERVICES, NAMELY, INDEPENDENT ASSESSMENT OF CONFORMITY OF RAILWAY SUBSYSTEMS AND CONSTITUENTS TO STANDARDS SET BY RAILWAY AUTHORITIES FOR PURPOSES OF ACCREDITATION; SCIENTIFIC SERVICES RELATING TO ENVIRONMENTAL IMPROVEMENTS, NAMELY TESTING AND MONITORING OF NOISE IN THE VICINITY OF RAILWAYS, AND TESTING AND MONITORING OF ELECTROMAGNETIC RADIATION GENERATED BY RAILWAYS; SCIENTIFIC SERVICES RELATING TO RAILWAY INFRASTRUCTURE, NAMELY TESTING OF TRACK GEOMETRY AND TESTING OF OVERHEAD LINES; SCIENTIFIC SERVICES NAMELY MATERIALS TESTING; SCIENTIFIC TESTING AND RESEARCH SERVICES TO EVALUATE THE CONDITION AND BEHAVIOR OF RAILWAY INFRASTRUCTURE IN THEORETICAL AND ACTUAL SITUATIONS; CONSULTANCY SERVICES IN THE FIELD OF RAILWAY VEHICLES, NAMELY, TESTING, EVALUATION AND ANALYSIS OF THE EFFECTS OF CRASHES AND IMPACTS ON VEHICLES

Trademark Events
Apr 20, 2018
Cancelled Sec. 8 (6-Yr)
Sep 13, 2016
Courtesy Reminder - Sec. 8 (6-Yr) E-Mailed
Oct 11, 2011
Teas Change Of Correspondence Received
Sep 13, 2011
Registered-Principal Register
Jun 28, 2011
Official Gazette Publication Confirmation E-Mailed
Jun 28, 2011
Published For Opposition
May 26, 2011
Law Office Publication Review Completed
May 26, 2011
Approved For Pub - Principal Register
May 20, 2011
Teas/Email Correspondence Entered
May 19, 2011
Correspondence Received In Law Office
May 19, 2011
Teas Response To Office Action Received
Mar 17, 2011
Notification Of Non-Final Action E-Mailed
Mar 17, 2011
Non-Final Action E-Mailed
Mar 17, 2011
Non-Final Action Written
Mar 7, 2011
Teas/Email Correspondence Entered
Mar 6, 2011
Correspondence Received In Law Office
Mar 6, 2011
Teas Response To Office Action Received
Oct 20, 2010
Notification Of Non-Final Action E-Mailed
Oct 20, 2010
Non-Final Action E-Mailed
Oct 20, 2010
Non-Final Action Written
Oct 1, 2010
Teas/Email Correspondence Entered
Oct 1, 2010
Correspondence Received In Law Office
Oct 1, 2010
Teas Response To Office Action Received
Jul 8, 2010
Assigned To Examiner
May 12, 2010
Notification Of Non-Final Action E-Mailed
May 12, 2010
Non-Final Action E-Mailed
May 12, 2010
Non-Final Action Written
May 5, 2010
Data Modification Completed
May 5, 2010
Assigned To Lie
Apr 15, 2010
Teas/Email Correspondence Entered
Apr 14, 2010
Correspondence Received In Law Office
Apr 14, 2010
Teas Response To Office Action Received
Oct 14, 2009
Notification Of Non-Final Action E-Mailed
Oct 14, 2009
Non-Final Action E-Mailed
Oct 14, 2009
Non-Final Action Written
Sep 17, 2009
Teas/Email Correspondence Entered
Sep 16, 2009
Correspondence Received In Law Office
Sep 16, 2009
Teas Response To Suspension Inquiry Received
Sep 1, 2009
Report Completed Suspension Check Case Still Suspended
Aug 10, 2009
Lie Checked Susp - To Atty For Action
Feb 10, 2009
Report Completed Suspension Check Case Still Suspended
Feb 5, 2009
Lie Checked Susp - To Atty For Action
Aug 4, 2008
Report Completed Suspension Check Case Still Suspended
Jul 25, 2008
Lie Checked Susp - To Atty For Action
Jul 25, 2008
Assigned To Lie
Jan 25, 2008
Notification Of Letter Of Suspension E-Mailed
Jan 25, 2008
Letter Of Suspension E-Mailed
Jan 25, 2008
Suspension Letter Written
Jan 22, 2008
Applicant/Correspondence Changes (Non-Responsive) Entered
Jan 22, 2008
Teas Change Of Owner Address Received
Jan 7, 2008
Teas/Email Correspondence Entered
Jan 5, 2008
Correspondence Received In Law Office
Jan 5, 2008
Teas Response To Office Action Received
Jul 7, 2007
Notification Of Non-Final Action E-Mailed
Jul 7, 2007
Non-Final Action E-Mailed
Jul 7, 2007
Non-Final Action Written
Jun 22, 2007
Assigned To Examiner
Mar 15, 2007
Notice Of Pseudo Mark Mailed
Mar 14, 2007
New Application Entered In Tram

Trademark Alertz updated from USPTO on 2030-01-24