Trademark: 76684552
Word
HOLLAND
Status
Dead
Status Code
710
Status Date
Friday, December 30, 2016
Serial Number
76684552
Registration Number
3791752
Registration Date
Tuesday, May 25, 2010
Mark Type
3000
Filing Date
Monday, December 3, 2007
Published for Opposition
Tuesday, March 9, 2010
Cancellation Date
Friday, December 30, 2016

Trademark Owner History
HOLLAND, L.P. - Original Registrant

Classifications
6 Structural parts for railroad freight cars, namely, metal lock load securement devices for securing shipping containers to vehicle floors or each other; chain securement systems comprised of metal chains and ratchets for securing cargo shipped inside of rail boxcars or on top of rail flat cars; ratchet tie-down strapping cargo protection system consisting of metal ratchets and cargo netting; load snugger tie down and tensioner systems comprised of metal ratchets and nylon straps for securing and protecting paper products during transportation inside a rail car; cross bar liners systems consisting of plastic coated metal bars used to protect steel coils during transportation; general purpose metal storage containers, namely, metal rack storage containers that contain permanently mounted welding equipment that travel on flat bed tractor trailers moving from job to job to perform flash butt welding; and metal rail pullers
9 Data management software in the field of railroad track testing of the track structure for accumulating and managing data that is used by railroads in managing their maintenance and repair of the track structure; software for scheduling and planning railroad construction, repair and testing
12 Structural parts for railroad freight cars, namely, structural parts affixed to railroad freight cars, namely, airbrake hose supports, anti wear and anti friction products in the nature of self-lubricating anti wear composite and plastic center bowl liners, brake beam guides, coupler carrier wear plates; railroad welding vehicles consisting primarily of hi-rail trucks with permanently mounted welding equipment, namely, a welder head, that move on railroad track or alongside railroad track or work in stationary plant work areas to perform flash butt rail welding; rail testing vehicles consisting primarily of hi-rail trucks with permanently mounted testing equipment that move on track to perform track structure testing to test rail wear, gauge strength, track geometry; railroad welding vehicles consisting primarily of hi-rail trucks with permanently mounted welding equipment, namely, a welder head and a rail puller, that move on railroad track or alongside railroad track or work in stationary plant work areas to perform flash butt rail welding; and transit rail testing vehicles consisting primarily of light weight hi-rail trucks with permanently mounted testing equipment that move on track to perform track structure testing to test rail wear, gauge strength, track geometry
37 Rail repair services for the railroad at a welding plant, namely, railroad dismantling services, namely, dismantling of rail that is shipped to the plant, construction grading services, namely, classification of rail at the plant, building construction services, namely, construction of turn key transloading facilities; repair of rail cars; maintenance and repair of locomotives; rail car waste disposal services for others
39 Cargo [ hauling, ] * handling, namely, transporting by truck and rail a variety of bulk cargo, bulk materials and bulk commodities; * Cargo handling, namely, handling of recovered derailment material: Operating of turn key transloading facilities in the nature of off loading material from rail cars, providing storage and delivery of bulk product to final destination
40 Welding services performed in conjunction with the installation and repair or repair of running rails used by the railroads, shipyard ports, power generation plants, factory sidings and transit systems performed utilizing mobile flash butt welding equipment or a stationary welding plant; manufacturing services for others in the field of specialized components for rail cars, namely, automatic locks for securement of containers to railcars for overseas uses in accordance with varying design requirements in various nations of the world; custom construction of rail track panels at the plant for use in the railroad field
42 Product testing, namely, railroad track testing services, namely, measuring the track geometry, profiling the rail wear, measuring the gauge strength of the track; Product development services, namely, development of equipment, namely, rail welding equipment and track testing equipment, mobile and stationary, for the purposes of reducing track maintenance, improving rail handling and improving construction and maintenance productivity; design of turn key transloading facilities; and rail car design service, namely, design of specialized components for rail cars, namely, automatic locks for securement of containers to rail cars for overseas uses in accordance with varying design requirements in various nations of the world
In the Statement, Page 2, line 17, "HAULING," is deleted, and, "HANDLING, NAMELY, TRANSPORTING BY TRUCK AND RAIL A VARIETY OF BULK CARGO, BULK MATERIALS AND BULK COMMODITIES;" is inserted.
Color is not claimed as a feature of the mark.
The mark consists of the wording "HOLLAND" to the right of three slanted blocks on top of one another.

Trademark Events
Feb 23, 2017
Cancellation Terminated No. 999999
Feb 23, 2017
Cancellation Granted No. 999999
Dec 30, 2016
Cancelled Sec. 8 (6-Yr)
Feb 2, 2016
Amendment Under Section 7 - Issued
Feb 2, 2016
Assigned To Paralegal
May 26, 2015
Cancellation Instituted No. 999999
May 25, 2010
Registered-Principal Register
Mar 9, 2010
Published For Opposition
Feb 17, 2010
Notice Of Publication
Feb 3, 2010
Law Office Publication Review Completed
Jan 28, 2010
Examiners Amendment Mailed
Jan 28, 2010
Approved For Pub - Principal Register
Jan 28, 2010
Examiner's Amendment Entered
Jan 28, 2010
Examiners Amendment -Written
Jan 22, 2010
Previous Allowance Count Withdrawn
Dec 18, 2009
Withdrawn From Pub - Og Review Query
Dec 7, 2009
Law Office Publication Review Completed
Dec 7, 2009
Approved For Pub - Principal Register
Nov 23, 2009
Examiners Amendment Mailed
Nov 23, 2009
Examiner's Amendment Entered
Nov 23, 2009
Examiners Amendment -Written
Nov 20, 2009
Examiners Amendment Mailed
Nov 20, 2009
Examiner's Amendment Entered
Nov 20, 2009
Examiners Amendment -Written
May 21, 2009
Examiner's Amendment/Priority Action Mailed
May 21, 2009
Combined Examiner's Amendment/Priority Action Entered
May 21, 2009
Examiners Amendment And/Or Priority Action - Completed
May 14, 2009
Previous Allowance Count Withdrawn
Apr 13, 2009
Withdrawn From Pub - Og Review Query
Mar 27, 2009
Law Office Publication Review Completed
Mar 27, 2009
Approved For Pub - Principal Register
Mar 6, 2009
Amendment From Applicant Entered
Mar 6, 2009
Correspondence Received In Law Office
Mar 5, 2009
Paper Received
Dec 24, 2008
Final Refusal Mailed
Dec 23, 2008
Final Refusal Written
Dec 5, 2008
Teas/Email Correspondence Entered
Dec 5, 2008
Correspondence Received In Law Office
Nov 21, 2008
Teas Response To Office Action Received
Sep 17, 2008
Non-Final Action Mailed
Sep 17, 2008
Non-Final Action Written
Aug 27, 2008
Amendment From Applicant Entered
Aug 27, 2008
Correspondence Received In Law Office
Aug 19, 2008
Assigned To Lie
Aug 14, 2008
Paper Received
Feb 15, 2008
Non-Final Action Mailed
Feb 14, 2008
Non-Final Action Written
Feb 4, 2008
Assigned To Examiner
Dec 11, 2007
Application Filing Receipt Mailed
Dec 7, 2007
New Application Entered In Tram

Trademark Alertz updated from USPTO on 2030-01-24